Changes in PJM Queue between August 10th, 2021 and November 4th, 2021.

Where an existing project has some updated field, you’ll find two rows for that project, with the new entry on top, updated fields highlighted in green, and deprecated fields highlighted in red in the bottom row.

Fully new queue positions appear as individual rows with all fields highlighted green.

Summary of Changes

##   old_obs   new_obs   changes additions  removals 
##      7470      8059       503       589         0

Changes

## Truncating HTML diff table to ${limit_html} rows...
## Creating HTML table for first ${limit_html} rows
QueueNumber chng_type Name CommercialName State County Status TransmissionOwner MaximumFacilityOutput MWEnergy MWCapacity MWInService CapacityorEnergy ProjectType Fuel ProjectACOrDC RightsMW InitialStudy FeasibilityStudy FeasibilityStudyStatus SystemImpactStudy SystemImpactStudyStatus FacilitiesStudy FacilitiesStudyStatus InterimInterconnectionServiceAgreement InterimInterconnectionServiceAgreementStatus WholesaleMarketParticipationAgreement ConstructionServiceAgreement ConstructionServiceAgreementStatus UpgradeConstructionServiceAgreement UpgradeConstructionServiceAgreementStatus BackfeedDate QueueDate LongTermFirmServiceStartDate LongTermFirmServiceEndDate TestEnergyDate WithdrawalDate WithdrawnRemarks ProjectedInServiceDate RevisedInServiceDate ActualInServiceDate SuspensionDate AttachmentType AlternateQueue SlideQueue
AA1-111 + Moshannon-East Towanda 230kV Renovo Energy Center PA Clinton Suspended PENELEC 463 463 463 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1111_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1111_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa1111_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa1_111_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa1_111_csa.pdf Document Posted N/A N/A 10/31/2014 N/A N/A 6/30/2025 6/30/2025 N/A N No This project slid to the next queue
AA1-111 - Moshannon-East Towanda 230kV PA Clinton Active PENELEC 463 463 463 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1111_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1111_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa1111_fac.pdf Document Posted N/A N/A 10/31/2014 N/A N/A 10/31/2019 N/A N No This project slid to the next queue
AA1-114 + Harwood-East Hazelton #2 69kV PA Carbon Withdrawn PPL 60 60 7.72 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1114_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1114_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa1114_fac.pdf Document Posted Withdrawn N/A N/A N/A 10/31/2014 N/A N/A 9/20/2016 Customer Initiated Withdrawal 12/30/2017 N/A N No
AA1-114 - Harwood-East Hazelton #2 69kV PA Carbon Withdrawn PPL 60 60 7.72 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1114_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1114_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa1114_fac.pdf Document Posted N/A N/A 10/31/2014 N/A N/A 9/20/2016 Customer Initiated Withdrawal 12/30/2017 N/A N No
AA1-115 + Thirty First Street 115kV PA Blair Withdrawn PENELEC 20 20 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1115_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1115_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa1115_fac.pdf Document Posted Withdrawn N/A N/A N/A 10/31/2014 N/A N/A 11/17/2016 Customer Initiated Withdrawal 6/1/2016 N/A N No
AA1-115 - Thirty First Street 115kV PA Blair Withdrawn PENELEC 20 20 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1115_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1115_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa1115_fac.pdf Document Posted N/A N/A 10/31/2014 N/A N/A 11/17/2016 Customer Initiated Withdrawal 6/1/2016 N/A N No
AA1-123 + Highland-Sammis 345kV South Field Energy Power Plant OH Columbiana In Service ATSI 1152 1152 1105 1152 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1123_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1123_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa1123_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa1_123_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa1_123_csa.pdf Document Posted N/A N/A 10/31/2014 N/A N/A 4/1/2021 7/29/2021 7/29/2021 6/14/2021 N/A N No
AA1-123 - Highland-Sammis 345kV South Field Energy Power Plant OH Columbiana Partially in Service - Under Construction ATSI 1152 1152 1105 345 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1123_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1123_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa1123_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa1_123_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa1_123_csa.pdf Document Posted N/A N/A 10/31/2014 N/A N/A 4/1/2021 7/29/2021 7/29/2021 6/14/2021 N/A N No
AA1-144 + East Towanda-Grover 230kV Gateway Bradford Plant PA Bradford Withdrawn PENELEC 163 163 163 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1144_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1144_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa1144_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa1_144_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa1_144_csa.pdf Document Posted N/A N/A 10/31/2014 N/A N/A 4/30/2022 10/12/2021 Customer Milestone Not Met 11/30/2021 11/30/2021 N/A N No
AA1-144 - East Towanda-Grover 230kV Gateway Bradford Plant PA Bradford Engineering and Procurement PENELEC 163 163 163 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1144_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1144_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa1144_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa1_144_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa1_144_csa.pdf Document Posted N/A N/A 10/31/2014 N/A N/A 4/30/2022 Customer Milestone Not Met 11/30/2021 11/30/2021 N/A N No
AA2-017 + East Palmerton-Acahela 69kV Penn Forest Wind Project PA Carbon Withdrawn PPL 98 98 12.7 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2017_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2017_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa2017_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa2_017_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_017_csa.pdf Document Posted N/A N/A 11/26/2014 N/A N/A 10/13/2021 12/31/2020 12/31/2020 N/A N No
AA2-017 - East Palmerton-Acahela 69kV Penn Forest Wind Project PA Carbon Suspended PPL 98 98 12.7 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2017_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2017_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa2017_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa2_017_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_017_csa.pdf Document Posted N/A N/A 11/26/2014 N/A N/A 12/31/2020 12/31/2020 N/A N No
AA2-048 + Allenwood-Larrabee 34kV Lakewood-Farmingdale Road Solar Farm & Storage Facility NJ Monmouth Engineering and Procurement JCPL 7 7 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2048_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2048_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/aa2048_wmpa.pdf Not Required N/A N/A 2/18/2015 N/A N/A 12/31/2020 8/31/2022 8/31/2022 N/A N No
AA2-048 - Allenwood-Larrabee 34kV Lakewood-Farmingdale Road Solar Farm & Storage Facility NJ Monmouth Engineering and Procurement JCPL 7 7 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2048_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2048_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/aa2048_wmpa.pdf Not Required N/A N/A 2/18/2015 N/A N/A 12/31/2020 10/1/2021 10/1/2021 N/A N No
AA2-084 + Lappans Road 12.5kV MD Washington Withdrawn APS 4 4 1.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2084_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2084_imp.pdf Document Posted Not Required Withdrawn N/A N/A N/A 3/31/2015 N/A N/A 9/20/2016 Customer Initiated Withdrawal 11/2/2016 N/A N No
AA2-084 - Lappans Road 12.5kV MD Washington Withdrawn APS 4 4 1.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2084_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2084_imp.pdf Document Posted Not Required N/A N/A 3/31/2015 N/A N/A 9/20/2016 Customer Initiated Withdrawal 11/2/2016 N/A N No
AA2-146 + Catoctin 34.5kV MD Frederick Withdrawn APS 20 20 10.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2146_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2146_imp.pdf Document Posted Not Required Withdrawn N/A N/A N/A 4/30/2015 N/A N/A 7/13/2016 Customer Milestone Not Met 9/15/2016 N/A N No
AA2-146 - Catoctin 34.5kV MD Frederick Withdrawn APS 20 20 10.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2146_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2146_imp.pdf Document Posted Not Required N/A N/A 4/30/2015 N/A N/A 7/13/2016 Customer Milestone Not Met 9/15/2016 N/A N No
AB1-004 + Solar Holler N/A N/A Withdrawn AEP 0.4 0.4 0 Energy Generation Interconnection Solar Withdrawn N/A N/A 5/4/2015 N/A N/A 5/19/2015 10/1/2015 N/A Y No
AB1-004 - Solar Holler, LLC N/A N/A Withdrawn AEP 0.4 0.4 0 Energy Generation Interconnection Solar Withdrawn N/A N/A 5/4/2015 N/A N/A 5/19/2015 10/1/2015 N/A Y No
AB1-089 + Byron-Wayne 345kV #1 IL Lee Active ComEd 575 575 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1089_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1089_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1089_fac.pdf Document Posted N/A N/A 9/30/2015 N/A N/A 6/1/2019 N/A N No
AB1-089 - Byron-Wayne 345kV #1 IL Lee Active ComEd 575 575 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1089_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1089_imp.pdf Document Posted In Progress N/A N/A 9/30/2015 N/A N/A 6/1/2019 N/A N No
AB1-092 + Moshannon-East Towanda 230kV Renovo Energy Center PA Clinton Suspended PENELEC 504 41 17 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1092_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1092_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1092_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_092_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_092_csa.pdf Document Posted N/A N/A 9/30/2015 N/A N/A 6/30/2025 6/30/2025 N/A N No
AB1-092 - Moshannon-East Towanda 230kV PA Clinton Active PENELEC 504 41 17 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1092_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1092_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1092_fac.pdf Document Posted N/A N/A 9/30/2015 N/A N/A 5/1/2019 N/A N No
AB1-096 + Carroll-Mt. Airy 34.5kV Union Bridge Solar Facility MD Carroll Engineering and Procurement APS 9.9 8.2 3.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1096_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1096_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab1_096_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_096_csa.pdf Document Posted N/A N/A 10/7/2015 N/A N/A 1/28/2022 11/1/2021 11/1/2021 N/A N No
AB1-096 - Carroll-Mt. Airy 34.5kV Union Bridge Solar Facility MD Carroll Engineering and Procurement APS 9.9 8.2 3.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1096_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1096_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab1_096_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_096_csa.pdf Document Posted N/A N/A 10/7/2015 N/A N/A 11/1/2021 11/1/2021 11/1/2021 N/A N No
AB1-109 + Mountaineer Mountaineer #1 WV Unknown Partially in Service - Under Construction AEP 1356 36 36 36 Capacity Generation Interconnection Coal https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1109_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1109_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab1_109_isa.pdf Document Posted N/A Not Required N/A N/A 10/26/2015 N/A N/A 6/1/2021 6/1/2021 12/31/2018 N/A N No
AB1-109 - Mountaineer Mountaineer #1 WV Unknown Under Construction AEP 1356 36 36 Capacity Generation Interconnection Coal https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1109_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1109_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab1_109_isa.pdf Document Posted N/A Not Required N/A N/A 10/26/2015 N/A N/A 6/1/2021 6/1/2021 N/A N No
AB1-173 + Brink-Trego 115kV Meherrin Solar VA Greensville Under Construction Dominion 19.8 19.8 13.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1173_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_173_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_173_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 4/1/2022 4/1/2022 N/A N No
AB1-173 - Brink-Trego 115kV Meherrin Solar VA Greensville Under Construction Dominion 19.8 19.8 13.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1173_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_173_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_173_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 1/1/2022 4/1/2022 4/1/2022 N/A N No
AB1-173A + Brink-Trego 115kV Meherrin Solar VA Greensville Under Construction Dominion 39.6 19.8 13.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173a_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173a_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1173a_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_173a_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_173a_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 4/1/2022 4/1/2022 N/A N No
AB1-173A - Brink-Trego 115kV Meherrin Solar VA Greensville Under Construction Dominion 39.6 19.8 13.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173a_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173a_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1173a_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_173a_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_173a_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 1/1/2022 4/1/2022 4/1/2022 N/A N No
AB2-010 + Saltville-Holston 34.5kV - Phase I Saltville-Holston 34.5kV Solar Facility VA Smyth Withdrawn AEP 5 5 2.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2010_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2010_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ab2010_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ab2010_wmpa.pdf Not Required N/A N/A 12/1/2015 N/A N/A 2/5/2019 12/1/2017 12/1/2017 N/A N No
AB2-010 - Saltville-Holston 34.5kV - Phase I Saltville-Holston 34.5kV Solar Facility VA Smyth Suspended AEP 5 5 2.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2010_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2010_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ab2010_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ab2010_wmpa.pdf Not Required N/A N/A 12/1/2015 N/A N/A 12/1/2017 12/1/2017 N/A N No
AB2-011 + Saltville-Holstone 34.5kV - Phase II Saltville-Holston 34.5kV Solar Facility VA Smyth Withdrawn AEP 5 5 2.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2011_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2011_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ab2011_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ab2011_wmpa.pdf Not Required N/A N/A 12/1/2015 N/A N/A 2/5/2019 12/1/2017 12/1/2017 N/A N No
AB2-011 - Saltville-Holstone 34.5kV - Phase II Saltville-Holston 34.5kV Solar Facility VA Smyth Suspended AEP 5 5 2.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2011_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2011_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ab2011_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ab2011_wmpa.pdf Not Required N/A N/A 12/1/2015 N/A N/A 12/1/2017 12/1/2017 N/A N No
AB2-019 + Erie West 345kV PA N/A Suspended PENELEC 28 Energy Merchant Transmission DC 28 NFTWR https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/ab2019_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/ab2019_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/merch-isa/ab2_019_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/merch-csa/ab2_019_csa.pdf Document Posted N/A N/A 2/3/2016 N/A N/A 3/31/2024 3/31/2024 N/A S No
AB2-019 - Erie West 345kV PA N/A Engineering and Procurement PENELEC 28 Energy Merchant Transmission DC 28 NFTWR https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/ab2019_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/ab2019_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/merch-isa/ab2_019_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/merch-csa/ab2_019_csa.pdf Document Posted N/A N/A 2/3/2016 N/A N/A 3/31/2024 3/31/2024 N/A S No
AB2-022 + Elizabeth City 34.5kV Elizabeth City Solar NC Camden Partially in Service - Under Construction Dominion 20 20 13 0.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2022_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2022_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ab2022_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ab2022_wmpa.pdf Not Required N/A N/A 2/4/2016 N/A N/A 8/1/2021 6/30/2021 6/30/2021 10/18/2021 N/A N No
AB2-022 - Elizabeth City 34.5kV Elizabeth City Solar NC Camden Under Construction Dominion 20 20 13 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2022_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2022_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ab2022_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ab2022_wmpa.pdf Not Required N/A N/A 2/4/2016 N/A N/A 8/1/2021 6/30/2021 6/30/2021 N/A N No
AB2-031 + Brink-Trego 115kV Meherrin Solar VA Greensville Under Construction Dominion 59.6 20 13.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2031_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2031_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2031_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_031_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_031_csa.pdf Document Posted N/A N/A 2/11/2016 N/A N/A 4/1/2022 4/1/2022 N/A N No
AB2-031 - Brink-Trego 115kV Meherrin Solar VA Greensville Under Construction Dominion 59.6 20 13.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2031_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2031_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2031_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_031_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_031_csa.pdf Document Posted N/A N/A 2/11/2016 N/A N/A 1/1/2022 4/1/2022 4/1/2022 N/A N No
AB2-037 + Keeney-Steele 230kV Cherrywood Solar I MD Caroline Engineering and Procurement DPL 202 202 76.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2037_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2037_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2037_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_037_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_037_csa.pdf Document Posted N/A N/A 2/26/2016 N/A N/A 12/1/2023 12/1/2023 N/A N No
AB2-037 - Keeney-Steele 230kV MD Caroline Active DPL 202 202 76.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2037_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2037_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2037_fac.pdf Document Posted N/A N/A 2/26/2016 N/A N/A 10/31/2019 N/A N No
AB2-038 + Frostburg 138kV PA Somerset In Service APS 139.4 0 4.2 0 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2038_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2038_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab2_038_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_038_csa.pdf Document Posted N/A N/A 2/29/2016 N/A N/A 12/15/2020 12/31/2020 12/31/2020 N/A N No
AB2-038 - Frostburg 138kV PA Somerset In Service APS 139.4 0 4.2 0 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2038_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2038_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab2_038_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_038_csa.pdf Document Posted N/A N/A 2/29/2016 N/A N/A 12/15/2020 10/26/2020 12/31/2020 12/31/2020 N/A N No
AB2-067 + Kammer-Vassell 765kV Guernsey Power Station OH Guernsey Under Construction AEP 1100 1100 1100 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2067_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2067_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2067_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_067_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_067_csa.pdf Document Posted N/A N/A 9/23/2021 3/31/2016 N/A N/A 6/11/2022 12/31/2022 12/31/2022 N/A N No
AB2-067 - Kammer-Vassell 765kV Guernsey Power Station OH Guernsey Under Construction AEP 1100 1100 1100 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2067_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2067_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2067_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_067_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_067_csa.pdf Document Posted N/A N/A 5/8/2021 3/31/2016 N/A N/A 3/24/2022 12/31/2022 12/31/2022 N/A N No
AB2-092 + Bergen 138kV Bergen Generating Station NJ Bergen Partially in Service - Under Construction PSEG 1371.1 51.1 51.1 16 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2092_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2092_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2092_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_092_isa.pdf Document Posted N/A Not Required N/A N/A 4/26/2016 N/A N/A 12/31/2025 12/5/2019 12/5/2019 12/5/2019 N/A N No
AB2-092 - Bergen 138kV Bergen Generating Station NJ Bergen Partially in Service - Under Construction PSEG 1371.1 51.1 51.1 16 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2092_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2092_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2092_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_092_isa.pdf Document Posted N/A Not Required N/A N/A 4/26/2016 N/A N/A 12/31/2025 12/5/2019 12/5/2019 N/A N No
AB2-093 + Ormet 138kV Hannibal Port Power Project OH Monroe Partially in Service - Under Construction AEP 485 485 485 485 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2093_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2093_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2093_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_093_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_093_csa.pdf Document Posted N/A N/A 12/15/2020 4/26/2016 N/A N/A 5/22/2021 9/13/2021 9/13/2021 6/1/2021 N/A N No
AB2-093 - Ormet 138kV Hannibal Port Power Project OH Monroe Under Construction AEP 485 485 485 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2093_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2093_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2093_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_093_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_093_csa.pdf Document Posted N/A N/A 12/15/2020 4/26/2016 N/A N/A 5/22/2021 9/13/2021 9/13/2021 N/A N No
AB2-102 + Cumberland 230kV NJ Cumberland Active AEC 230 230 225 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2102_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2102_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2102_fac.pdf Document Posted N/A N/A 4/28/2016 N/A N/A 6/1/2020 N/A N No
AB2-102 - Cumberland 230kV NJ Cumberland Active AEC 230 230 225 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2102_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2102_imp.pdf Document Posted In Progress N/A N/A 4/28/2016 N/A N/A 6/1/2020 N/A N No
AB2-160 + Reams 115kV Reams Solar VA Dinwiddie Engineering and Procurement Dominion 80 80 30.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2160_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2160_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2160_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_160_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_160_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 6/1/2022 12/31/2022 12/31/2022 N/A N No
AB2-160 - Reams 115kV Reams Solar VA Dinwiddie Engineering and Procurement Dominion 80 80 30.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2160_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2160_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2160_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_160_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_160_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 1/1/2022 12/31/2022 12/31/2022 N/A N No
AB2-161 + Waverly #2 DP 115kV Waverly Solar VA Sussex Engineering and Procurement Dominion 50 50 19 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2161_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2161_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2161_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_161_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_161_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 9/16/2022 9/16/2022 N/A N No
AB2-161 - Waverly #2 DP 115kV Waverly Solar VA Sussex Engineering and Procurement Dominion 50 50 19 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2161_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2161_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2161_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_161_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_161_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 1/1/2022 9/16/2022 9/16/2022 N/A N No
AB2-170 + East Lima-Marysville 345kV Hardin Energy Center OH Hardin In Service AEP 150 130 49.4 130 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2170_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2170_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2170_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_170_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_170_csa.pdf Document Posted N/A N/A 8/7/2020 4/29/2016 N/A N/A 10/13/2020 6/1/2021 6/1/2021 10/13/2020 N/A N No
AB2-170 - East Lima-Marysville 345kV Hardin Energy Center OH Hardin Partially in Service - Under Construction AEP 150 130 49.4 130 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2170_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2170_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2170_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_170_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_170_csa.pdf Document Posted N/A N/A 8/7/2020 4/29/2016 N/A N/A 10/13/2020 6/1/2021 6/1/2021 10/13/2020 N/A N No
AC1-001 + Delano 138kV Salt City Solar OH Ross Engineering and Procurement AEP 49.9 49.9 33.93 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1001_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1001_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1001_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_001_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_001_csa.pdf Document Posted N/A N/A 5/5/2016 N/A N/A 12/31/2022 12/31/2022 N/A N No
AC1-001 - Delano 138kV OH Ross Active AEP 49.9 49.9 33.93 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1001_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1001_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1001_fac.pdf Document Posted N/A N/A 5/5/2016 N/A N/A 10/31/2017 N/A N No
AC1-044 + Kammer-Vassell 765kV Guernsey Power Station OH Guernsey Under Construction AEP 1650 550 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1044_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1044_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1044_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_044_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_044_csa.pdf Document Posted N/A N/A 9/23/2021 8/31/2016 N/A N/A 3/24/2022 12/31/2022 12/31/2022 N/A N No
AC1-044 - Kammer-Vassell 765kV Guernsey Power Station OH Guernsey Under Construction AEP 1650 550 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1044_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1044_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1044_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_044_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_044_csa.pdf Document Posted N/A N/A 5/8/2021 8/31/2016 N/A N/A 3/24/2022 12/31/2022 12/31/2022 N/A N No
AC1-054 + Kerr Dam–Eatons Ferry 115 kV Hawtree Creek NC Warren In Service Dominion 65 65 44.5 65 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1054_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1054_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1054_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_054_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_054_csa.pdf Document Posted N/A N/A 8/31/2016 N/A N/A 12/1/2021 6/1/2021 6/1/2021 10/1/2021 N/A N No
AC1-054 - Kerr Dam–Eatons Ferry 115 kV Hawtree Creek NC Warren Under Construction Dominion 65 65 44.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1054_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1054_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1054_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_054_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_054_csa.pdf Document Posted N/A N/A 8/31/2016 N/A N/A 8/2/2021 6/1/2021 6/1/2021 N/A N No
AC1-082 + Ravenswood-Hemlock 69kV OH Meigs Active AEP 48 48 29 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1082_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1082_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1082_fac.pdf Document Posted N/A N/A 9/30/2016 N/A N/A 5/1/2018 N/A N No
AC1-082 - Ravenswood-Hemlock 69kV OH Meigs Active AEP 48 48 29 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1082_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1082_imp.pdf Document Posted In Progress N/A N/A 9/30/2016 N/A N/A 5/1/2018 N/A N No
AC1-083 + Smith Mountain-Bearskin 138kV Maplewood Solar VA Pittsylvania Under Construction AEP 100 100 38 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1083_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1083_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1083_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_083_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_083_csa.pdf Document Posted N/A N/A 12/15/2021 9/30/2016 N/A N/A 12/28/2021 4/1/2022 4/1/2022 N/A N No
AC1-083 - Smith Mountain-Bearskin 138kV Maplewood Solar VA Pittsylvania Under Construction AEP 100 100 38 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1083_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1083_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1083_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_083_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_083_csa.pdf Document Posted N/A N/A 10/4/2021 9/30/2016 N/A N/A 11/1/2021 4/1/2022 4/1/2022 N/A N No
AC1-110 + Aurora 138kV Aurora Generation IL Du Page Engineering and Procurement ComEd 1046 30 30 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1110_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1110_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1110_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_110_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_110_csa.pdf Document Posted N/A N/A 10/26/2016 N/A N/A 8/28/2023 8/28/2023 N/A N No
AC1-110 - Aurora 138kV IL Du Page Active ComEd 1010 30 30 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1110_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1110_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1110_fac.pdf Document Posted N/A N/A 10/26/2016 N/A N/A 6/1/2017 N/A N No
AC1-117 + Stockton 34.5kV Leatherwood VA Henry Withdrawn AEP 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1117_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1117_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac1117_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac1117_wmpa.pdf Not Required N/A N/A 10/27/2016 N/A N/A 12/31/2021 12/31/2021 N/A N Yes
AC1-117 - Stockton 34.5kV Leatherwood VA Henry Suspended AEP 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1117_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1117_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac1117_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac1117_wmpa.pdf Not Required N/A N/A 10/27/2016 N/A N/A 12/31/2021 12/31/2021 N/A N Yes
AC1-145 + Gretna DP 69 kV Whitethorn Solar VA Pittsylvania Under Construction Dominion 50 50 19 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1145_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1145_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1145_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_145_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_145_csa.pdf Document Posted N/A N/A 7/1/2021 10/31/2016 N/A N/A 9/1/2021 9/1/2021 9/1/2021 N/A N No
AC1-145 - Gretna DP 69 kV Whitethorn Solar VA Pittsylvania Under Construction Dominion 50 50 19 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1145_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1145_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1145_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_145_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_145_csa.pdf Document Posted N/A N/A 7/1/2021 10/31/2016 N/A N/A 7/23/2021 9/1/2021 9/1/2021 N/A N No
AC1-158 + Spotsylvania 500kV Spotsylvania Energy Center VA Spotsylvania Partially in Service - Under Construction Dominion 500 500 347.5 485 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1158_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1158_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1158_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_158_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_158_csa.pdf Document Posted N/A N/A 6/1/2020 10/31/2016 N/A N/A 8/19/2020 12/31/2022 12/31/2022 9/2/2020 N/A N No
AC1-158 - Spotsylvania 500kV Spotsylvania Energy Center VA Spotsylvania Partially in Service - Under Construction Dominion 500 500 347.5 260 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1158_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1158_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1158_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_158_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_158_csa.pdf Document Posted N/A N/A 6/1/2020 10/31/2016 N/A N/A 8/19/2020 12/31/2022 12/31/2022 9/2/2020 N/A N No
AC1-164 + Chickahominy 230kV Keydet Solar Center One VA Charles City Under Construction Dominion 320 320 220.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1164_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1164_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1164_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_164_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_164_csa.pdf Document Posted N/A N/A 10/1/2021 10/31/2016 N/A N/A 10/1/2021 6/30/2023 6/30/2023 N/A N No
AC1-164 - Chickahominy 230kV Keydet Solar Center One VA Charles City Engineering and Procurement Dominion 320 320 220.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1164_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1164_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1164_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_164_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_164_csa.pdf Document Posted N/A N/A 9/1/2021 10/31/2016 N/A N/A 10/1/2021 6/30/2022 6/30/2022 N/A N No
AC1-174 + Losantville 345kV Riverstart Solar Park IN Randolph Partially in Service - Under Construction AEP 100 100 38 66 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1174_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1174_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1174_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_174_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_174_csa.pdf Document Posted N/A N/A 7/5/2021 10/31/2016 N/A N/A 9/24/2021 6/1/2022 6/1/2022 9/24/2021 N/A N No
AC1-174 - Losantville 345kV Riverstart Solar Park IN Randolph Under Construction AEP 100 100 38 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1174_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1174_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1174_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_174_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_174_csa.pdf Document Posted N/A N/A 7/5/2021 10/31/2016 N/A N/A 8/2/2021 6/1/2022 6/1/2022 N/A N No
AC1-175 + Losantville 345kV Riverstart Solar Park IN Randolph Partially in Service - Under Construction AEP 100 100 38 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1175_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1175_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1175_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_175_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_175_csa.pdf Document Posted N/A N/A 7/5/2021 10/31/2016 N/A N/A 9/10/2021 6/1/2022 6/1/2022 N/A N No
AC1-175 - Losantville 345kV Riverstart Solar Park IN Randolph Under Construction AEP 100 100 38 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1175_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1175_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1175_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_175_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_175_csa.pdf Document Posted N/A N/A 7/5/2021 10/31/2016 N/A N/A 8/2/2021 6/1/2022 6/1/2022 N/A N No
AC1-192 + Conastone-Peach Bottom N/A N/A Withdrawn Unknown Energy Merchant Transmission N/A N/A 10/31/2016 N/A N/A 11/2/2016 N/A EE No
AC1-192 - Conastone-Peach Bottom N/A N/A Withdrawn PECO Energy Merchant Transmission N/A N/A 10/31/2016 N/A N/A 11/2/2016 N/A EE No
AC1-204 + Elwood Jackson Generation IL Will Under Construction ComEd 1200.9 1200.9 1115.9 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1204_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1204_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1204_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_204_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_204_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 11/8/2021 11/8/2021 11/8/2021 N/A N No
AC1-204 - Elwood Jackson Generation IL Will Under Construction ComEd 1200.9 1200.9 1115.9 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1204_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1204_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1204_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_204_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_204_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 11/1/2021 11/2/2021 11/2/2021 N/A N No
AC2-050 + Tabernacle 12kV NJ Burlington Active AEC 10 10 3.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2050_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2050_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2050_fac.pdf Document Posted Not Required N/A N/A 2/10/2017 N/A N/A 6/1/2019 N/A N No
AC2-050 - Tabernacle 12kV NJ Burlington Active AEC 10 10 3.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2050_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2050_imp.pdf Document Posted In Progress N/A N/A 2/10/2017 N/A N/A 6/1/2019 N/A N No
AC2-059 + Biers Run-Circleville 138kV Yellowbud Solar OH Ross Engineering and Procurement AEP 127 127 62.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2059_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2059_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2059_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_059_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_059_csa.pdf Document Posted N/A N/A 5/1/2022 2/16/2017 N/A N/A 6/1/2022 12/15/2022 12/15/2022 N/A N No
AC2-059 - Biers Run-Circleville 138kV OH Ross Active AEP 127 127 62.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2059_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2059_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2059_fac.pdf Document Posted N/A N/A 2/16/2017 N/A N/A 12/31/2019 N/A N No
AC2-120 + Ripley 69kV Ripley Solar MD Charles Engineering and Procurement SMECO 27.5 27.5 10.45 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2120_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2120_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2120_fac.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac2120_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac2120_wmpa.pdf Not Required N/A N/A 3/23/2017 N/A N/A 10/1/2020 2/28/2023 2/28/2023 N/A N No
AC2-120 - Ripley 69kV Ripley Solar MD Charles Engineering and Procurement SMECO 27.5 27.5 10.45 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2120_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2120_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2120_fac.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac2120_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac2120_wmpa.pdf Not Required N/A N/A 3/23/2017 N/A N/A 10/1/2020 6/1/2021 6/1/2021 N/A N No
AC2-195 + Galion-Roberts South 138kV Marion County Solar Project OH Marion Engineering and Procurement ATSI 100 99.96 62.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2195_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2195_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2195_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_195_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_195_csa.pdf Document Posted N/A N/A 3/31/2017 N/A N/A 10/1/2023 10/1/2023 N/A N No
AC2-195 - Galion-Roberts South 138kV OH Marion Active ATSI 100 99.96 62.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2195_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2195_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2195_fac.pdf Document Posted N/A N/A 3/31/2017 N/A N/A 12/31/2020 N/A N No
AD1-015 + Frazeysburg 138 kV Muskingum Solar OH Muskingum Engineering and Procurement AEP 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1015_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1015_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1015_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_015_isa.pdf Document Posted N/A N/A N/A 4/21/2017 N/A N/A 12/31/2023 12/31/2023 N/A N No
AD1-015 - Frazeysburg 138 kV OH Muskingum Active AEP 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1015_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1015_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1015_fac.pdf Document Posted N/A N/A 4/21/2017 N/A N/A 6/1/2019 N/A N No
AD1-017 + Smith Mountain-Bearskin 138 kV Maplewood Solar VA Pittsylvania Under Construction AEP 120 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1017_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1017_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1017_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_017_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_017_csa.pdf Document Posted N/A N/A 12/17/2021 5/11/2017 N/A N/A 12/28/2021 4/1/2022 4/1/2022 N/A N No
AD1-017 - Smith Mountain-Bearskin 138 kV Maplewood Solar VA Pittsylvania Under Construction AEP 120 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1017_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1017_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1017_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_017_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_017_csa.pdf Document Posted N/A N/A 5/11/2017 N/A N/A 4/1/2022 4/1/2022 N/A N No
AD1-031 + Kewanee - E.D. Edwards 138 kV IL Henry Active ComEd 70 70 26.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1031_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1031_imp.pdf Document Posted In Progress N/A N/A 7/24/2017 N/A N/A 10/31/2021 10/31/2021 N/A N No
AD1-031 - Kewanee 138 kV IL Henry Active ComEd 70 70 26.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1031_fea.pdf Document Posted In Progress N/A N/A 7/24/2017 N/A N/A 10/31/2021 10/31/2021 N/A N No
AD1-033 + Fentress-Landstown 230 kV Bedford Solar Center VA City of Chesapeake Partially in Service - Under Construction Dominion 70 70 42 14 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1033_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1033_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1033_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_033_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_033_csa.pdf Document Posted N/A N/A 7/26/2017 N/A N/A 12/31/2021 12/1/2021 12/1/2021 9/17/2021 N/A N No
AD1-033 - Fentress-Landstown 230 kV Bedford Solar Center VA City of Chesapeake Under Construction Dominion 70 70 42 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1033_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1033_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1033_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_033_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_033_csa.pdf Document Posted N/A N/A 7/26/2017 N/A N/A 8/24/2021 12/1/2021 12/1/2021 N/A N No
AD1-039 + Kendall-Tazewell & Dresden-Mole Creek IL Grundy Active ComEd 1262.7 102.7 93 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1039_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1039_imp.pdf Document Posted In Progress N/A N/A 7/28/2017 N/A N/A 3/1/2022 3/1/2022 N/A N No This project slid to the next queue
AD1-039 - Kendall-Tazewell & Dresden-Mole Creek IL Grundy Active ComEd 1262.7 102.7 112.7 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1039_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1039_imp.pdf Document Posted In Progress N/A N/A 7/28/2017 N/A N/A 3/1/2022 3/1/2022 N/A N No
AD1-060 + Mercersburg-Milnor 34.5 kV Upton Solar PA Franklin In Service APS 15 15 5.7 15 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1060_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1060_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad1_060_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_060_csa.pdf Document Posted N/A N/A 8/18/2017 N/A N/A 9/1/2021 9/1/2021 9/1/2021 12/17/2020 N/A N No
AD1-060 - Mercersburg-Milnor 34 kV Upton Solar PA Franklin In Service APS 15 15 5.7 15 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1060_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1060_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad1_060_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_060_csa.pdf Document Posted N/A N/A 8/18/2017 N/A N/A 9/1/2021 9/1/2021 9/1/2021 12/17/2020 N/A N No
AD1-061 + McConnelsburg-Mercersburg 34 kV PA Franklin Under Construction APS 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1061_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1061_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1061_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_061_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_061_csa.pdf Document Posted N/A N/A 8/18/2017 N/A N/A 12/31/2021 N/A N No
AD1-061 - McConnelsburg-Mercersburg 34 kV PA Franklin Active APS 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1061_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1061_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1061_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_061_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_061_csa.pdf Document Posted N/A N/A 8/18/2017 N/A N/A 12/31/2021 N/A N No
AD1-072 + Biers Run-Circleville 138 kV Yellowbud Solar OH Ross Engineering and Procurement AEP 147 20 13.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1072_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1072_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1072_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_072_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_072_csa.pdf Document Posted N/A N/A 8/31/2017 N/A N/A 12/15/2022 12/15/2022 N/A N No
AD1-072 - Biers Run-Circleville 138 kV OH Ross Active AEP 147 20 13.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1072_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1072_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1072_fac.pdf Document Posted N/A N/A 8/31/2017 N/A N/A 6/1/2020 N/A N No
AD1-081 + Beatty-London 138 kV OH Madison Active ATSI 196 20 13.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1081_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1081_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1081_fac.pdf Document Posted N/A N/A 9/5/2017 N/A N/A 6/1/2020 N/A N No
AD1-081 - Beatty-London 138 kV OH Madison Active ATSI 196 20 13.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1081_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1081_imp.pdf Document Posted In Progress N/A N/A 9/5/2017 N/A N/A 6/1/2020 N/A N No
AD1-083 + Page-Bethel 138 kV Cape Solar VA Page Engineering and Procurement APS 100 100 60.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1083_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1083_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1083_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_083_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_083_csa.pdf Document Posted N/A N/A 9/11/2017 N/A N/A 12/31/2023 12/31/2023 N/A N No
AD1-083 - Page-Bethel 138 kV VA Page Active APS 100 100 60.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1083_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1083_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1083_fac.pdf Document Posted N/A N/A 9/11/2017 N/A N/A 12/31/2019 N/A N No
AD1-086 + E. Frankfort-Goodings Grove N/A N/A Withdrawn Unknown Energy Merchant Transmission https://www.pjm.com/pub/planning/project-queues/arr-impact-studies/ad1086_arr-imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/arr-facilities-studies/ad1086_arr-fac.pdf Document Posted N/A N/A 9/14/2017 N/A N/A 8/23/2021 6/20/2021 6/20/2021 N/A EE No
AD1-086 - E. Frankfort-Goodings Grove IL Will Active ComEd 23.9 Energy Merchant Transmission https://www.pjm.com/pub/planning/project-queues/arr-impact-studies/ad1086_arr-imp.pdf Document Posted In Progress N/A N/A 9/14/2017 N/A N/A 6/20/2021 6/20/2021 N/A EE No
AD1-140 + Greene-Clark 138 kV Kingwood Solar OH Greene Engineering and Procurement ATSI 175 175 95.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1140_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1140_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1140_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_140_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_140_csa.pdf Document Posted N/A N/A 9/29/2017 N/A N/A 9/30/2023 9/30/2023 N/A N No
AD1-140 - Greene-Clark 138 kV OH Greene Active ATSI 175 175 95.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1140_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1140_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1140_fac.pdf Document Posted N/A N/A 9/29/2017 N/A N/A 5/29/2020 N/A N No
AD1-152 + Clover-Sedge Hill 230 kV VA Halifax Active Dominion 80 80 48 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1152_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1152_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ad1_152_isa2.pdf Interim Study N/A N/A N/A 9/30/2017 N/A N/A 12/31/2020 N/A N No
AD1-152 - Clover-Sedge Hill 230 kV VA Halifax Active Dominion 80 80 48 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1152_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1152_imp.pdf Document Posted In Progress N/A N/A 9/30/2017 N/A N/A 12/31/2020 N/A N No
AD1-155 + Meadow Brook-Strasburg 138 kV Foxglove Solar VA Frederick Engineering and Procurement APS 75 75 37.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1155_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1155_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1155_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_155_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_155_csa.pdf Document Posted N/A N/A 9/30/2017 N/A N/A 10/31/2023 10/31/2023 N/A N No
AD1-155 - Meadow Brook-Strasburg 138 kV VA Frederick Active APS 75 75 37.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1155_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1155_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1155_fac.pdf Document Posted N/A N/A 9/30/2017 N/A N/A 12/31/2020 N/A N No
AD2-009 + McConnellsburg 138 kV Great Cover Solar LLC PA Fulton Engineering and Procurement APS 70 70 48.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2009_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2009_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2009_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_009_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_009_csa.pdf Document Posted N/A N/A 11/3/2017 N/A N/A 3/31/2023 3/31/2023 N/A N No
AD2-009 - McConnellsburg 138 kV PA Fulton Active APS 70 70 48.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2009_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2009_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2009_fac.pdf Document Posted N/A N/A 11/3/2017 N/A N/A 6/30/2019 N/A N No
AD2-014 + Steubenville 69 kV OH Jefferson Active AEP 49.5 49.5 20.79 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2014_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2014_imp.pdf Document Posted In Progress N/A N/A 11/8/2017 N/A N/A 12/31/2019 N/A N No
AD2-014 - Steubenville 69 kV OH Jefferson Active AEP 53.3 53.325 22.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2014_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2014_imp.pdf Document Posted In Progress N/A N/A 11/7/2017 N/A N/A 12/31/2019 N/A N No
AD2-016 + Biers Run-Circleville 138 kV Yellowbud Solar OH Ross Engineering and Procurement AEP 274 127 62.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2016_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2016_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2016_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_016_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_016_csa.pdf Document Posted N/A N/A 11/15/2017 N/A N/A 12/15/2022 12/15/2022 N/A N No
AD2-016 - Biers Run-Circleville 138 kV OH Ross Active AEP 274 127 62.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2016_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2016_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2016_fac.pdf Document Posted N/A N/A 11/15/2017 N/A N/A 12/31/2020 N/A N No
AD2-048 + Cynthia-Headquarters 69 kV KY Harrison Active EKPC 70 70 46.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2048_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2048_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2048_fac.pdf Document Posted N/A N/A 1/31/2018 N/A N/A 6/1/2020 N/A N No
AD2-048 - Cynthia-Headquarters 69 kV KY Harrison Active EKPC 70 70 46.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2048_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2048_imp.pdf Document Posted In Progress N/A N/A 1/31/2018 N/A N/A 6/1/2020 N/A N No
AD2-055 + Moshannon-East Towanda 230 kV Renovo Energy Center PA Clinton Suspended PENELEC 548 44 35 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2055_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2055_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2055_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_055_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_055_csa.pdf Document Posted N/A N/A 2/9/2018 N/A N/A 6/30/2025 6/30/2025 N/A N No
AD2-055 - Moshannon-East Towanda 230 kV PA Clinton Active PENELEC 548 44 35 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2055_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2055_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2055_fac.pdf Document Posted N/A N/A 2/9/2018 N/A N/A 10/1/2020 N/A N No
AD2-059 + Chapel Street 138 kV DE New Castle Active DPL 0.8 0.77 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2059_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2059_imp.pdf Document Posted Not Required N/A N/A 2/21/2018 N/A N/A 10/1/2018 N/A N No
AD2-059 - Chapel Street 138 kV DE New Castle Active DPL 0.8 0.77 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2059_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2059_imp.pdf Document Posted N/A N/A 2/21/2018 N/A N/A 10/1/2018 N/A N No
AD2-065 + Atco 12 kV Kettle Run NJ Burlington Under Construction AEC 2.6 2.57 1.08 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2065_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2065_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2065_fac.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ad2065_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ad2065_wmpa.pdf Not Required N/A N/A 2/27/2018 N/A N/A 5/20/2022 5/20/2022 N/A N No
AD2-065 - Atco 12 kV Kettle Run NJ Burlington Engineering and Procurement AEC 2.6 2.57 1.08 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2065_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2065_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2065_fac.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ad2065_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ad2065_wmpa.pdf Not Required N/A N/A 2/27/2018 N/A N/A 5/20/2022 5/20/2022 N/A N No
AD2-066 + Mazon-Crescent Ridge 138 kV IL Grundy Active ComEd 116 116 69.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2066_fea.pdf Document Posted In Progress N/A N/A 2/28/2018 N/A N/A 9/1/2020 N/A N No
AD2-066 - Mazon-Crescent Ridge IL Grundy Active ComEd 116 116 69.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2066_fea.pdf Document Posted In Progress N/A N/A 2/28/2018 N/A N/A 9/1/2020 N/A N No
AD2-093 + Marysville 345kV OH Union Active AEP 225 225 135 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2093_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2093_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2093_fac.pdf Document Posted N/A N/A 3/20/2018 N/A N/A 12/31/2020 N/A N No
AD2-093 - Marysville 345kV OH Union Active AEP 225 225 135 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2093_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2093_imp.pdf Document Posted In Progress N/A N/A 3/20/2018 N/A N/A 12/31/2020 N/A N No
AD2-100 + Kincaid-Pana 345 kV IL Christian Active ComEd 210 210 126 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2100_fea.pdf Document Posted In Progress N/A N/A 3/21/2018 N/A N/A 12/31/2021 N/A N No
AD2-100 - Kincaid-Pana IL Christian Active ComEd 210 210 126 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2100_fea.pdf Document Posted In Progress N/A N/A 3/21/2018 N/A N/A 12/31/2021 N/A N No
AD2-103 + Crane CT 1 115kV MD Baltimore County Withdrawn BGE 14 14 14 Capacity Generation Interconnection Oil https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2103_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2103_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2103_fac.pdf Document Posted Withdrawn N/A Withdrawn N/A N/A 3/22/2018 N/A N/A 10/27/2021 10/31/2019 N/A N No
AD2-103 - Crane CT 1 115kV MD Baltimore County Active BGE 14 14 14 Capacity Generation Interconnection Oil https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2103_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2103_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2103_fac.pdf Document Posted N/A N/A 3/22/2018 N/A N/A 10/31/2019 N/A N No
AD2-104 + Crane CT 2-3-4 115kV MD Baltimore County Active BGE 144.6 144.6 144.6 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2104_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2104_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2104_fac.pdf Document Posted Withdrawn N/A Withdrawn N/A N/A 3/22/2018 N/A N/A 10/31/2019 N/A N No
AD2-104 - Crane CT 2-3-4 115kV MD Baltimore County Active BGE 144.6 144.6 144.6 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2104_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2104_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2104_fac.pdf Document Posted N/A N/A 3/22/2018 N/A N/A 10/31/2019 N/A N No
AD2-163 + Broadview-Tangy 138 kV Madison Fields Solar Project OH Madison Engineering and Procurement ATSI 180 180 120.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2163_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2163_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2163_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_163_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_163_csa.pdf Document Posted N/A N/A 3/26/2018 N/A N/A 10/1/2023 10/1/2023 N/A N No
AD2-163 - Broadview-Tangy 138 kV OH Madison Active ATSI 180 180 120.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2163_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2163_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2163_fac.pdf Document Posted N/A N/A 3/26/2018 N/A N/A 12/1/2021 N/A N No
AD2-172 + Lena 138kV High Point Solar IL Stephenson Engineering and Procurement ComEd 50 50 21 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2172_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2172_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2172_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_172_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_172_csa.pdf Document Posted N/A N/A 3/28/2018 N/A N/A 2/28/2023 2/28/2023 N/A N No
AD2-172 - Lena 138kV IL Stephenson Active ComEd 50 50 21 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2172_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2172_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2172_fac.pdf Document Posted N/A N/A 3/28/2018 N/A N/A 5/19/2020 N/A N No
AD2-180 + Elk Garden-Parr Run 138kV Black Rock Wind WV Mineral Partially in Service - Under Construction APS 110 110 15.08 10 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2180_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2180_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2180_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_180_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_180_csa.pdf Document Posted N/A N/A 3/29/2018 N/A N/A 12/15/2021 12/15/2021 10/25/2021 N/A N No
AD2-180 - Elk Garden-Parr Run 138kV Black Rock Wind WV Mineral Under Construction APS 110 110 15.08 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2180_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2180_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2180_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_180_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_180_csa.pdf Document Posted N/A N/A 3/29/2018 N/A N/A 12/15/2021 12/15/2021 N/A N No
AD2-189 + Kammer-Vassell 765kV Guernsey Power Station OH Guernsey Under Construction AEP 1875 225 186 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2189_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2189_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad2_189_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_189_csa.pdf Document Posted N/A N/A 9/23/2021 3/30/2018 N/A N/A 6/11/2022 12/31/2022 12/31/2022 N/A N No
AD2-189 - Kammer-Vassell 765kV Guernsey Power Station OH Guernsey Under Construction AEP 1875 225 186 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2189_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2189_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad2_189_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_189_csa.pdf Document Posted N/A N/A 5/8/2021 3/30/2018 N/A N/A 3/24/2022 12/31/2022 12/31/2022 N/A N No
AD2-213 + East Flemington-Lebanon 34.5 kV VESI - East Flemington Energy Storage NJ Hunterdon Engineering and Procurement JCPL 20 20 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2213_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2213_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2213_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_213_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_213_csa.pdf Document Posted N/A N/A 3/30/2018 N/A N/A 8/30/2022 8/30/2022 N/A N No
AD2-213 - East Flemington-Lebanon 34.5 kV VESI - East Flemington Energy Storage NJ Hunterdon Engineering and Procurement JCPL 20 20 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2213_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2213_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2213_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_213_isa.pdf Document Posted N/A N/A N/A 3/30/2018 N/A N/A 8/30/2022 8/30/2022 N/A N No
AE1-007 + Camden-Crystal III 69 kV OH Preble Withdrawn Dayton 89.9 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1007_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1007_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1007_fac.pdf Document Posted Withdrawn N/A Withdrawn N/A N/A 4/23/2018 N/A N/A 8/16/2021 7/1/2019 N/A N No
AE1-007 - Camden-Crystal III 69 kV OH Preble Active Dayton 89.9 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1007_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1007_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1007_fac.pdf Document Posted N/A N/A 4/23/2018 N/A N/A 7/1/2019 N/A N No
AE1-032 4948568 + AMIL-PJM N/A N/A Withdrawn Calpine Energy Services, L.P. 180 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4954950_ltf1.pdf Withdrawn N/A N/A 5/24/2018 6/1/2021 6/1/2026 10/4/2018 N/A PP No
AE1-032 4948568 - AMIL-PJM N/A N/A Withdrawn 180 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4954950_ltf1.pdf Withdrawn N/A N/A 5/24/2018 6/1/2021 6/1/2026 10/4/2018 N/A PP No
AE1-033 4950965 + ALTE-PJM N/A N/A Withdrawn Calpine Energy Services, L.P. 165 Energy Long-Term Firm Transmission Withdrawn N/A N/A 6/4/2018 6/1/2022 6/1/2027 12/21/2018 N/A PP No
AE1-033 4950965 - ALTE-PJM N/A N/A Withdrawn 165 Energy Long-Term Firm Transmission Withdrawn N/A N/A 6/4/2018 6/1/2022 6/1/2027 12/21/2018 N/A PP No
AE1-042 4954950 + TVA-PJM N/A N/A Withdrawn Calpine Energy Services, L.P. 180 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1042_fea.pdf Executed Agreement and/or Study N/A N/A 6/26/2018 6/1/2021 6/1/2026 2/1/2019 N/A PP No
AE1-042 4954950 - TVA-PJM N/A N/A Withdrawn 180 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1042_fea.pdf Executed Agreement and/or Study N/A N/A 6/26/2018 6/1/2021 6/1/2026 2/1/2019 N/A PP No
AE1-044 + Morrisville 230 kV VA Fauquier Active Dominion 200 200 111.7933 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1044_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1044_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1044_fac.pdf Document Posted N/A N/A 7/5/2018 N/A N/A 11/2/2020 N/A N No
AE1-044 - Morrisville 230 kV VA Fauquier Active Dominion 200 200 111.7933 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1044_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1044_imp.pdf Document Posted In Progress N/A N/A 7/5/2018 N/A N/A 11/2/2020 N/A N No
AE1-071 + Shade Gap-Roxbury 115 kV PA Franklin Active PENELEC 100.1 100.1 62.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1071_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1071_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1071_fac.pdf Document Posted N/A N/A 7/31/2018 N/A N/A 12/1/2021 N/A N No
AE1-071 - Shade Gap-Roxbury 115 kV PA Franklin Active PENELEC 100.1 100.1 62.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1071_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1071_imp.pdf Document Posted In Progress N/A N/A 7/31/2018 N/A N/A 12/1/2021 N/A N No
AE1-095 4966859 + PJM-HUDSON N/A N/A Withdrawn Hudson Transmission Partners, LLC 62 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1095_fea.pdf Executed Agreement and/or Study N/A N/A 8/30/2018 6/1/2020 6/1/2021 2/27/2019 N/A PP No
AE1-095 4966859 - PJM-HUDSON N/A N/A Withdrawn 62 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1095_fea.pdf Executed Agreement and/or Study N/A N/A 8/30/2018 6/1/2020 6/1/2021 2/27/2019 N/A PP No
AE1-096 4966862 + PJM-HUDSON N/A N/A Withdrawn Hudson Transmission Partners, LLC 62 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1096_fea.pdf Executed Agreement and/or Study N/A N/A 8/30/2018 6/1/2021 6/1/2022 2/27/2019 N/A PP No
AE1-096 4966862 - PJM-HUDSON N/A N/A Withdrawn 62 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1096_fea.pdf Executed Agreement and/or Study N/A N/A 8/30/2018 6/1/2021 6/1/2022 2/27/2019 N/A PP No
AE1-097 4966877 + PJM-HUDSON N/A N/A Withdrawn Hudson Transmission Partners, LLC 62 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1097_fea.pdf Executed Agreement and/or Study N/A N/A 8/30/2018 6/1/2022 6/1/2027 2/27/2019 N/A PP No
AE1-097 4966877 - PJM-HUDSON N/A N/A Withdrawn 62 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1097_fea.pdf Executed Agreement and/or Study N/A N/A 8/30/2018 6/1/2022 6/1/2027 2/27/2019 N/A PP No
AE1-100 + Axton 138 kV VA Henry Active AEP 66 66 41.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1100_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1100_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1100_fac.pdf Document Posted N/A N/A 8/31/2018 N/A N/A 12/15/2021 N/A N No
AE1-100 - Axton 138 kV VA Henry Active AEP 66 66 41.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1100_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1100_imp.pdf Document Posted In Progress N/A N/A 8/31/2018 N/A N/A 12/15/2021 N/A N No
AE1-101 + McConnellsburg-Texas Eastern 138 kV Great Cove Solar II PA Franklin Engineering and Procurement APS 150 150 100.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1101_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1101_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1101_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae1_101_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1_101_csa.pdf Document Posted N/A N/A 8/31/2018 N/A N/A 3/31/2023 3/31/2023 N/A N No
AE1-101 - McConnellsburg-Texas Eastern 138 kV PA Franklin Active APS 150 150 100.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1101_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1101_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1101_fac.pdf Document Posted N/A N/A 8/31/2018 N/A N/A 5/31/2021 N/A N No
AE1-104 + BL England 138 kV Ocean Wind LLC NJ Cape May Engineering and Procurement AEC 432 432 121.4 Capacity Generation Interconnection Offshore Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1104_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1104_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1104_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae1_104_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1_104_csa.pdf Document Posted N/A N/A 9/6/2018 N/A N/A 10/1/2024 10/1/2024 N/A N No
AE1-104 - BL England 138 kV NJ Cape May Active AEC 432 432 121.4 Capacity Generation Interconnection Offshore Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1104_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1104_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1104_fac.pdf Document Posted N/A N/A 9/6/2018 N/A N/A 6/1/2023 N/A N No
AE1-110 4966477 + PJM-DUK N/A N/A Withdrawn Morgan Stanley Capital Group Inc. 100 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4966477_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1110_fea.pdf Executed Agreement and/or Study N/A N/A 8/28/2018 1/1/2025 1/1/2030 2/28/2019 N/A PP No
AE1-110 4966477 - PJM-DUK N/A N/A Withdrawn 100 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4966477_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1110_fea.pdf Executed Agreement and/or Study N/A N/A 8/28/2018 1/1/2025 1/1/2030 2/28/2019 N/A PP No
AE1-111 4966479 + PJM-DUK N/A N/A Withdrawn Morgan Stanley Capital Group Inc. 100 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4966479_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1111_fea.pdf Executed Agreement and/or Study N/A N/A 8/28/2018 1/1/2025 1/1/2031 2/28/2019 N/A PP No
AE1-111 4966479 - PJM-DUK N/A N/A Withdrawn 100 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4966479_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1111_fea.pdf Executed Agreement and/or Study N/A N/A 8/28/2018 1/1/2025 1/1/2031 2/28/2019 N/A PP No
AE1-112 4966484 + PJM-DUK N/A N/A Withdrawn Morgan Stanley Capital Group Inc. 100 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4966484_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1112_fea.pdf Executed Agreement and/or Study N/A N/A 8/28/2018 1/1/2025 1/1/2032 2/28/2019 N/A PP No
AE1-112 4966484 - PJM-DUK N/A N/A Withdrawn 100 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4966484_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1112_fea.pdf Executed Agreement and/or Study N/A N/A 8/28/2018 1/1/2025 1/1/2032 2/28/2019 N/A PP No
AE1-119 + Lemoyne 345 kV OH Wood Withdrawn ATSI 1260 550 550 Capacity Generation Interconnection Natural Gas; Other https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1119_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1119_imp.pdf Document Posted Withdrawn N/A N/A 9/17/2018 N/A N/A 10/27/2021 6/1/2022 N/A N No
AE1-119 - Lemoyne 345 kV OH Wood Active ATSI 1260 550 550 Capacity Generation Interconnection Natural Gas; Other https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1119_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1119_imp.pdf Document Posted In Progress N/A N/A 9/17/2018 N/A N/A 6/1/2022 N/A N No
AE1-129 + Zion View - Middletown 115 kV Strinestown Solar Project PA York Engineering and Procurement ME 79.6 79.6 47 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1129_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1129_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1129_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae1_129_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1_129_csa.pdf Document Posted N/A N/A 9/7/2018 N/A N/A 12/31/2023 12/31/2023 N/A N No
AE1-129 - Zion View - Middletown 115 kV Strinestown Solar Project PA York Engineering and Procurement ME 79.6 79.6 47 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1129_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1129_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1129_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae1_129_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1_129_csa Document Posted N/A N/A 9/7/2018 N/A N/A 12/31/2023 12/31/2023 N/A N No
AE1-154 + Louisa-South Anna 230 kV Belcher Solar VA Louisa Engineering and Procurement Dominion 105.2 17 10 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1154_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1154_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_154_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1_154_csa.pdf Document Posted N/A N/A 9/24/2018 N/A N/A 12/1/2022 12/1/2021 12/1/2021 N/A N No
AE1-154 - Louisa-South Anna 230 kV Belcher Solar VA Louisa Engineering and Procurement Dominion 105.2 17 10 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1154_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1154_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_154_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1_154_csa.pdf Document Posted N/A N/A 9/24/2018 N/A N/A 12/1/2021 12/1/2021 12/1/2021 N/A N No
AE1-155 + Garner-Northern Neck 115 kV VA City of Richmond Active Dominion 127 127 76.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1155_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1155_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ae1_155_isa2.pdf Interim Study N/A N/A N/A 9/24/2018 N/A N/A 10/23/2020 N/A N No
AE1-155 - Garner-Northern Neck 115 kV VA City of Richmond Active Dominion 127 127 76.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1155_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1155_imp.pdf Document Posted In Progress N/A N/A 9/24/2018 N/A N/A 10/23/2020 N/A N No
AE1-183 + Maysville-McDowell 69 kV Jackson Center Solar Facility PA Mercer Suspended ATSI 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1183_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1183_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1183_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae1_183_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1_183_csa.pdf Document Posted N/A N/A 9/25/2018 N/A N/A 5/15/2023 5/15/2023 N/A N No
AE1-183 - Maysville-McDowell 69 kV Jackson Center Solar Facility PA Mercer Engineering and Procurement ATSI 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1183_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1183_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1183_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae1_183_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1_183_csa.pdf Document Posted N/A N/A 9/25/2018 N/A N/A 5/15/2023 5/15/2023 N/A N No
AE1-196 + Hokes-Jackson 69 kV II Cottontail Solar 8 PA York Engineering and Procurement ME 20 20 12.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1196_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1196_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1196_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae1_196_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1_196_csa.pdf Document Posted N/A N/A 9/26/2018 N/A N/A 12/31/2022 12/31/2022 N/A N No
AE1-196 - Hokes-Jackson 69 kV II PA York Active ME 20 20 12.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1196_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1196_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1196_fac.pdf Document Posted N/A N/A 9/26/2018 N/A N/A 4/1/2021 N/A N No
AE1-230 + Shockoe 69 kV VA Pittsylvania Withdrawn Dominion 20 20 7.2 Capacity Generation Interconnection Storage; Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1230_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1230_imp.pdf Document Posted In Progress N/A N/A 9/28/2018 N/A N/A 9/1/2021 7/31/2020 N/A N No
AE1-230 - Shockoe 69 kV VA Pittsylvania Active Dominion 20 20 7.2 Capacity Generation Interconnection Storage; Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1230_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1230_imp.pdf Document Posted In Progress N/A N/A 9/28/2018 N/A N/A 7/31/2020 N/A N No
AE1-231 + Hughesville 69 kV MD Charles Withdrawn SMECO 20 20 9.4 Capacity Generation Interconnection Storage; Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1231_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1231_imp.pdf Document Posted Withdrawn N/A N/A 9/28/2018 N/A N/A 9/3/2021 7/31/2020 N/A N No
AE1-231 - Hughesville 69 kV MD Charles Active SMECO 20 20 9.4 Capacity Generation Interconnection Storage; Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1231_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1231_imp.pdf Document Posted In Progress N/A N/A 9/28/2018 N/A N/A 7/31/2020 N/A N No
AE2-005 + Harmony Village-Shackleford 115 kV Walnut Solar I VA King and Queen Engineering and Procurement Dominion 130 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2005_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2005_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae2_005_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_005_csa.pdf Document Posted N/A N/A 10/4/2018 N/A N/A 12/31/2022 12/31/2022 N/A N No
AE2-005 - Harmony Village-Shackleford 115 kV Walnut Solar I VA King and Queen Engineering and Procurement Dominion 130 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2005_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2005_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae2_005_isa.pdf Document Posted N/A Not Required N/A N/A 10/4/2018 N/A N/A 12/31/2022 12/31/2022 N/A N No
AE2-022 + Cardiff 230 kV III NJ Atlantic Active AEC 300 300 52.8 Capacity Generation Interconnection Offshore Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2022_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2022_imp.pdf Document Posted In Progress N/A N/A 12/14/2018 N/A N/A 12/1/2024 N/A N No
AE2-022 - Cardiff 230 kV III NJ Atlantic Active AEC 300 300 62.09 Capacity Generation Interconnection Offshore Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2022_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2022_imp.pdf Document Posted In Progress N/A N/A 12/14/2018 N/A N/A 12/1/2024 N/A N No
AE2-035 + Lena 138 kV High Point II Solar IL Stephenson Engineering and Procurement ComEd 50 50 21 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2035_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2035_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2035_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_035_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_035_csa.pdf Document Posted N/A N/A 1/15/2019 N/A N/A 2/28/2023 2/28/2023 N/A N No
AE2-035 - Lena 138 kV IL Stephenson Active ComEd 50 50 21 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2035_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2035_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2035_fac.pdf Document Posted N/A N/A 1/15/2019 N/A N/A 5/21/2021 N/A N No
AE2-042 + Milton 69 kV Northumberland Solar PA Northumberland Engineering and Procurement PPL 70 70 46.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2042_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2042_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2042_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_042_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_042_csa.pdf Document Posted N/A N/A 1/23/2019 N/A N/A 3/24/2023 3/24/2023 N/A N No
AE2-042 - Milton 69 kV Northumberland Solar PA Northumberland Engineering and Procurement PPL 70 70 46.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2042_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2042_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2042_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2042_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2042_csa.pdf Document Posted N/A N/A 1/23/2019 N/A N/A 3/24/2023 3/24/2023 N/A N No
AE2-059 + Derry Tap-Derry Bus 69 kV PA Northumberland Active PPL 20 20 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2059_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2059_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2059_fac.pdf Document Posted N/A N/A 2/1/2019 N/A N/A 3/5/2021 N/A N No
AE2-059 - Derry Tap-Derry Bus 69 kV PA Northumberland Active PPL 20 20 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2059_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2059_imp.pdf Document Posted In Progress N/A N/A 2/1/2019 N/A N/A 3/5/2021 N/A N No
AE2-060 + Mifflintown Bus-Mifflintown Tap 69 kV PA Juniata Active PPL 20 20 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2060_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2060_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2060_fac.pdf Document Posted N/A N/A 2/1/2019 N/A N/A 3/5/2021 N/A N No
AE2-060 - Mifflintown Bus-Mifflintown Tap 69 kV PA Juniata Active PPL 20 20 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2060_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2060_imp.pdf Document Posted In Progress N/A N/A 2/1/2019 N/A N/A 3/5/2021 N/A N No
AE2-084 + Derry Tap-Derry Bus 69 kV PA Montour Active PPL 20 20 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2084_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2084_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2084_fac.pdf Document Posted N/A N/A 2/1/2019 N/A N/A 3/5/2021 N/A N No
AE2-084 - Derry Tap-Derry Bus 69 kV PA Montour Active PPL 20 20 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2084_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2084_imp.pdf Document Posted In Progress N/A N/A 2/1/2019 N/A N/A 3/5/2021 N/A N No
AE2-091 + Newport 69 kV NJ Cumberland Withdrawn Unknown 35 35 23 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2091_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2091_imp.pdf Document Posted N/A N/A 1/24/2019 N/A N/A 3/31/2020 6/30/2022 N/A N No
AE2-091 - Newport 69 kV NJ Cumberland Withdrawn AEC 35 35 23 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2091_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2091_imp.pdf Document Posted N/A N/A 1/24/2019 N/A N/A 3/31/2020 6/30/2022 N/A N No
AE2-104 + Suffolk 115 kV VA Accomack Active Dominion 49 49 18.92 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2104_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2104_imp.pdf Document Posted In Progress N/A N/A 2/28/2019 N/A N/A 11/30/2021 N/A N No
AE2-104 - Suffolk 115 kV VA City of Suffolk Active Dominion 49 49 18.92 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2104_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2104_imp.pdf Document Posted In Progress N/A N/A 2/28/2019 N/A N/A 11/30/2021 N/A N No
AE2-113 + Farmers Valley-Ridgeway 115 kV PA McKean Active PENELEC 120 120 61.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2113_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2113_imp.pdf Document Posted In Progress N/A N/A 2/28/2019 N/A N/A 12/31/2020 N/A N No
AE2-113 - Farmers Valley-Ridgeway 115 kV PA McKean Active APS 120 120 61.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2113_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2113_imp.pdf Document Posted In Progress N/A N/A 2/28/2019 N/A N/A 12/31/2020 N/A N No
AE2-133 + Penns Tap-Richfield Tie 69 kV PA Snyder Active PPL 20 20 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2133_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2133_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2133_fac.pdf Document Posted N/A N/A 2/28/2019 N/A N/A 3/5/2021 N/A N No
AE2-133 - Penns Tap-Richfield Tie 69 kV PA Snyder Active PPL 20 20 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2133_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2133_imp.pdf Document Posted In Progress N/A N/A 2/28/2019 N/A N/A 3/5/2021 N/A N No
AE2-148 + Beatty-Greene 345 kV OH Madison Active AEP 577 577 397.3 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2148_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2148_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ae2_148_isa2.pdf Interim Study N/A Not Required N/A N/A 2/20/2019 N/A N/A 6/1/2022 N/A N No
AE2-148 - Beatty-Greene 345 kV OH Madison Active AEP 577 577 397.3 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2148_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2148_imp.pdf Document Posted In Progress Not Required N/A N/A 2/20/2019 N/A N/A 6/1/2022 N/A N No
AE2-169 + Delaware-Van Buren 138 kV IN Delaware Active AEP 163 33 33 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2169_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2169_imp.pdf Document Posted In Progress N/A N/A 3/15/2019 N/A N/A 12/31/2022 N/A N No
AE2-169 - Delaware-Van Buren 138 kV IN Delaware Active AEP 163 33 33 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2169_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2169_imp.pdf Document Posted In Progress N/A N/A 3/15/2019 N/A N/A 12/31/2022 N/A N No
AE2-218 + Eldean 138 kV OH Miami Active Dayton 178 178 106 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2218_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2218_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2218_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/csa/ae2_218_csa.pdf Document Posted N/A N/A 3/21/2019 N/A N/A 12/31/2021 N/A N No
AE2-218 - Eldean 138 kV OH Miami Active Dayton 178 178 106 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2218_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2218_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2218_fac.pdf Document Posted N/A N/A 3/21/2019 N/A N/A 12/31/2021 N/A N No
AE2-282 + East Fayette 138 kV OH Fulton Engineering and Procurement ATSI 67 67 43.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2282_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2282_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ae2_282_isa2.pdf Interim Study N/A N/A N/A 3/29/2019 N/A N/A 9/15/2021 N/A N No
AE2-282 - East Fayette 138 kV OH Fulton Active ATSI 67 67 43.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2282_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2282_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ae2_282_isa2.pdf Interim Study N/A N/A N/A 3/29/2019 N/A N/A 9/15/2021 N/A N No
AE2-285 + Maysville 69 kV MC Solar I PA Mercer Suspended ATSI 50 50 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2285_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2285_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2285_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_285_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_285_csa.pdf Document Posted N/A N/A 3/29/2019 N/A N/A 1/2/2023 1/2/2023 N/A N No
AE2-285 - Maysville 69 kV MC Solar I PA Mercer Engineering and Procurement ATSI 50 50 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2285_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2285_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2285_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_285_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_285_csa.pdf Document Posted N/A N/A 3/29/2019 N/A N/A 1/2/2023 1/2/2023 N/A N No
AE2-319 + Atlanta 69kV I OH Pickaway Active Dayton 100 100 66.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2319_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2319_imp.pdf Document Posted In Progress N/A N/A 3/30/2019 N/A N/A 12/1/2022 N/A N No
AE2-319 - Atlanta 69kV I OH Pickaway Active Dayton 100 100 66.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2319_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2319_imp.pdf Document Posted In Progress N/A N/A 3/30/2019 N/A N/A 4/1/2019 12/1/2022 N/A N No
AE2-343 + Andover (Maysville) 69 kV II PA Crawford Active ATSI 17.9 17.9 12.3 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2343_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2343_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2343_fac.pdf Document Posted N/A N/A 3/31/2019 N/A N/A 9/30/2020 N/A N No
AE2-343 - Andover (Maysville) 69 kV II PA Crawford Active ATSI 17.9 17.9 12.3 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2343_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2343_imp.pdf Document Posted In Progress N/A N/A 3/31/2019 N/A N/A 9/30/2020 N/A N No
AF1-001 + Thayerville 34.5 kV Sand Flat Road Solar Project MD Garrett Suspended APS 13.8 13.75 6.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1001_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1001_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af1001_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af1001_wmpa.pdf Not Required N/A N/A 4/1/2019 N/A N/A 2/28/2023 2/28/2023 N/A N No
AF1-001 - Thayerville 34.5 kV Sand Flat Road Solar Project MD Garrett Engineering and Procurement APS 13.8 13.75 6.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1001_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1001_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af1001_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af1001_wmpa.pdf Not Required N/A N/A 4/1/2019 N/A N/A 2/28/2023 2/28/2023 N/A N No
AF1-003 + Hawkins Gate-Billingsley Rd 69 kV Charles County Solar II MD Charles Engineering and Procurement SMECO 20 20 9.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1003_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1003_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/af1003_fac.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af1003_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af1003_wmpa.pdf Not Required N/A N/A 4/1/2019 N/A N/A 9/30/2024 9/30/2024 N/A N No
AF1-003 - Hawkins Gate-Billingsley Rd 69 kV MD Charles Active SMECO 20 20 9.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1003_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1003_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/af1003_fac.pdf Document Posted Not Required N/A N/A 4/1/2019 N/A N/A 7/30/2021 N/A N No
AF1-005 + Grayton-Ripley 69 kV Charles County Solar I MD Charles Engineering and Procurement SMECO 20 20 9.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1005_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1005_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/af1005_fac.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af1005_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af1005_wmpa.pdf Not Required N/A N/A 4/1/2019 N/A N/A 9/30/2024 9/30/2024 N/A N No
AF1-005 - Charles County Solar I MD Charles Active SMECO 20 20 9.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1005_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1005_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/af1005_fac.pdf Document Posted Not Required N/A N/A 4/1/2019 N/A N/A 7/30/2021 N/A N No
AF1-014 + Harmony Village-Shackleford 115 kV Walnut Solar I VA King and Queen Engineering and Procurement Dominion 149.9 19.9 7.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1014_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1014_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/af1_014_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/af1_014_csa.pdf Document Posted N/A N/A 4/3/2019 N/A N/A 12/31/2023 12/31/2023 N/A N No
AF1-014 - Harmony Village-Shackleford 115 kV Walnut Solar I VA King and Queen Engineering and Procurement Dominion 149.9 19.9 7.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1014_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1014_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/af1_014_isa.pdf Document Posted N/A Not Required N/A N/A 4/3/2019 N/A N/A 12/31/2023 12/31/2023 N/A N No
AF1-028 + Endless Caverns 115 kV VA Rockingham Active Dominion 200 200 200 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1028_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1028_imp.pdf Document Posted In Progress N/A N/A 5/13/2019 N/A N/A 10/31/2023 N/A N No
AF1-028 - Endless Caverns 115 kV VA Rockingham Active Dominion 200 200 200 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1028_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1028_imp.pdf Document Posted In Progress N/A N/A 5/13/2019 N/A N/A 10/31/2023 N/A N No
AF1-099 + Moshannon-Milesburg 230 kV PA Huntingdon Active APS 126.5 126.5 75.9 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1099_fea.pdf Document Posted N/A N/A 9/4/2019 N/A N/A 4/1/2022 N/A N No
AF1-099 - Moshannon-Milesburg 230 kV PA Huntingdon Active APS 126.5 126.5 75.9 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1099_fea.pdf Document Posted In Progress N/A N/A 9/4/2019 N/A N/A 4/1/2022 N/A N No
AF1-123 + Oceana 230 kV VA City of Chesapeake Active Dominion 880 880 267.5 Capacity Generation Interconnection Offshore Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/af1123_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1123_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_123_isa2.pdf Interim Study N/A N/A N/A 9/17/2019 N/A N/A 12/31/2025 N/A N No
AF1-123 - Fentress 500 kV VA City of Chesapeake Active Dominion 880 880 267.5 Capacity Generation Interconnection Offshore Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/af1123_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1123_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_123_isa2.pdf Interim Study N/A N/A N/A 9/17/2019 N/A N/A 12/31/2025 N/A N No
AF1-124 + Oceana 230 kV VA City of Chesapeake Active Dominion 880 880 267.5 Capacity Generation Interconnection Offshore Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/af1124_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1124_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_124_isa2.pdf Interim Study N/A N/A N/A 9/17/2019 N/A N/A 12/31/2026 N/A N No
AF1-124 - Fentress 500 kV VA City of Chesapeake Active Dominion 880 880 267.5 Capacity Generation Interconnection Offshore Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/af1124_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1124_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_124_isa2.pdf Interim Study N/A N/A N/A 9/17/2019 N/A N/A 12/31/2026 N/A N No
AF1-125 + Oceana 230 kV VA City of Chesapeake Active Dominion 880 880 267.5 Capacity Generation Interconnection Offshore Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/af1125_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1125_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_125_isa2.pdf Interim Study N/A N/A N/A 9/17/2019 N/A N/A 12/31/2024 N/A N No
AF1-125 - Fentress 500 kV VA City of Chesapeake Active Dominion 880 880 267.5 Capacity Generation Interconnection Offshore Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/af1125_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1125_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_125_isa2.pdf Interim Study N/A N/A N/A 9/17/2019 N/A N/A 12/31/2024 N/A N No
AF1-140 + Claysburg 23 kV BL-Diamond Bear Rocks PA Adams Suspended PENELEC 16.3 16.3 9.78 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1140_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1140_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af1140_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af1140_wmpa.pdf Not Required N/A N/A 9/18/2019 N/A N/A 2/28/2023 2/28/2023 N/A N No
AF1-140 - Claysburg 23 kV BL-Diamond Bear Rocks PA Blair Suspended PENELEC 16.3 16.3 9.78 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1140_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1140_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af1140_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af1140_wmpa.pdf Not Required N/A N/A 9/18/2019 N/A N/A 2/28/2023 2/28/2023 N/A N No
AF1-147 + Poland Rd-Runway DP 230kV Dulles Solar VA Loudoun Engineering and Procurement Dominion 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1147_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1147_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/af1147_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/af1_147_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/af1_147_csa.pdf Document Posted N/A N/A 9/19/2019 N/A N/A 12/31/2023 12/31/2023 N/A N No
AF1-147 - Poland Rd-Runway DP 230kV VA Loudoun Active Dominion 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1147_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1147_imp.pdf Document Posted In Progress N/A N/A 9/19/2019 N/A N/A 6/1/2023 N/A N No
AF1-150 + Midfield 22.9 kV Pittsburgh International Airport PA Allegheny In Service DL 14.4 14.4 4.28 14.4 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/af1150_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1150_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af1150_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af1150_wmpa.pdf Not Required N/A N/A 4/1/2021 9/19/2019 N/A N/A 4/1/2021 9/1/2021 9/1/2021 10/28/2021 N/A N No
AF1-150 - Midfield 22.9 kV Pittsburgh International Airport PA Allegheny Under Construction DL 14.4 14.4 4.28 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/af1150_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1150_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af1150_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af1150_wmpa.pdf Not Required N/A N/A 4/1/2021 9/19/2019 N/A N/A 4/1/2021 9/1/2021 9/1/2021 N/A N No
AF1-215 + Reynolds-Olive 345 kV IN Starke Active AEP 300 300 180 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1215_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1215_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_215_isa2.pdf Interim Study N/A N/A N/A 9/26/2019 N/A N/A 5/31/2021 N/A N No
AF1-215 - Reynolds-Olive 345 kV IN Starke Active AEP 300 300 180 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1215_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1215_imp.pdf Document Posted In Progress N/A N/A 9/26/2019 N/A N/A 5/31/2021 N/A N No
AF1-227 + Marysville – Gunn Road 345 kV OH Union Active AEP 325 325 195 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1227_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1227_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_227_isa2.pdf Interim Study N/A N/A N/A 9/27/2019 N/A N/A 5/31/2022 N/A N No
AF1-227 - Marysville-East Lima 345 kV OH Union Active AEP 325 325 195 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1227_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1227_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_227_isa2.pdf Interim Study N/A N/A N/A 9/27/2019 N/A N/A 5/31/2022 N/A N No
AF1-230 + Chatfield 138 kV OH Crawford Withdrawn Unknown 49 49 29.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1230_fea.pdf Document Posted N/A N/A 9/27/2019 N/A N/A 2/5/2020 10/31/2022 N/A N No
AF1-230 - Chatfield 138 kV OH Crawford Withdrawn AEP 49 49 29.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1230_fea.pdf Document Posted N/A N/A 9/27/2019 N/A N/A 2/5/2020 10/31/2022 N/A N No
AF1-250 + Maysville 69 kV II PA Mercer Withdrawn ATSI 68 18 10.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1250_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1250_imp.pdf Document Posted Withdrawn N/A N/A 9/30/2019 N/A N/A 9/24/2021 6/30/2022 N/A N No
AF1-250 - Maysville 69 kV II PA Mercer Active ATSI 68 18 10.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1250_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1250_imp.pdf Document Posted In Progress N/A N/A 9/30/2019 N/A N/A 6/30/2022 N/A N No
AF1-265 + Four Rivers-Hanover 230 kV VA Hanover Active Dominion 435 150 150 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1265_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1265_imp.pdf Document Posted In Progress N/A N/A 9/30/2019 N/A N/A 12/31/2022 N/A N No
AF1-265 - Four Rivers-Hanover 230 kV VA Hanover Active Dominion 450 150 150 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1265_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1265_imp.pdf Document Posted In Progress N/A N/A 9/30/2019 N/A N/A 12/31/2022 N/A N No
AF1-271 + Keisters-Krendale 138 kV PA Butler Withdrawn APS 60 60 36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1271_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1271_imp.pdf Document Posted Withdrawn N/A N/A 9/30/2019 N/A N/A 10/11/2021 12/31/2023 N/A N No
AF1-271 - Keisters-Krendale 138 kV PA Butler Active APS 60 60 36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1271_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1271_imp.pdf Document Posted In Progress N/A N/A 9/30/2019 N/A N/A 12/31/2023 N/A N No
AF1-290 + Feagans Mill-Millville 138 kV WV Jefferson Active APS 80 80 40.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1290_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1290_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_290_isa2.pdf Interim Study N/A N/A N/A 9/30/2019 N/A N/A 6/14/2021 N/A N No
AF1-290 - Feagans Mill-Millville 138 kV WV Jefferson Active APS 80 80 40.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1290_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1290_imp.pdf Document Posted In Progress N/A N/A 9/30/2019 N/A N/A 6/14/2021 N/A N No
AF2-018 + Inez 138 kV KY Martin Active AEP 200 200 133.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2018_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2018_imp.pdf Document Posted In Progress N/A N/A 11/1/2019 N/A N/A 12/1/2023 N/A N No
AF2-018 - Inez 138 kV KY Martin Active AEP 200 200 133.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2018_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2018_imp.pdf Document Posted Withdrawn N/A N/A 11/1/2019 N/A N/A 12/1/2023 N/A N No
AF2-019 + Middle 69 kV NJ Cape May Active AEC 20 20 8 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2019_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2019_imp.pdf Document Posted In Progress N/A N/A 11/15/2019 N/A N/A 6/1/2021 N/A N No
AF2-019 - Middle 69 kV NJ Cape May Active AEC 20 40 40 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2019_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2019_imp.pdf Document Posted In Progress N/A N/A 11/15/2019 N/A N/A 6/1/2021 N/A N No
AF2-045 + Cambria Nug 115 kV Cambria Energy PA Cambria Withdrawn PENELEC 20 20 2 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2045_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2045_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/af2_045_isa.pdf Document Posted N/A Not Required N/A N/A 12/13/2019 N/A N/A 10/8/2021 9/30/2022 9/30/2022 N/A N No
AF2-045 - Cambria Nug 115 kV Cambria Energy PA Cambria Engineering and Procurement PENELEC 20 20 2 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2045_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2045_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/af2_045_isa.pdf Document Posted N/A Not Required N/A N/A 12/13/2019 N/A N/A 9/30/2022 9/30/2022 N/A N No
AF2-057 + Grassfield 34.5 kV Cedar Energy Center VA City of Chesapeake Engineering and Procurement Dominion 20 20 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2057_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2057_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af2057_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af2057_wmpa.pdf Not Required N/A N/A 1/22/2020 N/A N/A 12/1/2024 12/1/2024 N/A N No
AF2-057 - Grassfield 34.5 kV VA City of Chesapeake Active Dominion 20 20 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2057_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2057_imp.pdf Document Posted In Progress N/A N/A 1/22/2020 N/A N/A 4/1/2022 N/A N No
AF2-110 + Suffolk 115 kV VA Accomack Active Dominion 69 20 7.72 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2110_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2110_imp.pdf Document Posted In Progress N/A N/A 2/26/2020 N/A N/A 11/30/2021 N/A N No
AF2-110 - Suffolk 115 kV VA City of Suffolk Active Dominion 69 20 7.72 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2110_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2110_imp.pdf Document Posted In Progress N/A N/A 2/26/2020 N/A N/A 11/30/2021 N/A N No
AF2-112 + Oakland-Gorman 69 kV Webb Solar MD Garrett Active APS 10 10 6.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2112_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2112_imp.pdf Document Posted In Progress N/A N/A 2/28/2020 N/A N/A 6/1/2022 N/A N No
AF2-112 - Oakland-Gorman 69 kV MD Garrett Active APS 17 17 11.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2112_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2112_imp.pdf Document Posted In Progress N/A N/A 2/28/2020 N/A N/A 6/1/2022 N/A N No
AF2-144 + Powhatan 34.5 kV Scott 1 BESS VA Powhatan Engineering and Procurement Dominion 17 17 10.2 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2144_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2144_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af2144_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af2144_wmpa.pdf Not Required N/A N/A 3/12/2020 N/A N/A 6/1/2023 6/1/2023 N/A N No
AF2-144 - Powhatan 34.5 kV VA Powhatan Active Dominion 17 17 10.2 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2144_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2144_imp.pdf Document Posted In Progress N/A N/A 3/12/2020 N/A N/A 6/1/2021 N/A N No
AF2-151 + Dillsburg 13.2 kV PA York Hess PA York Suspended ME 3 3 1.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2151_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2151_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af2151_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af2151_wmpa.pdf Not Required N/A N/A 3/16/2020 N/A N/A 9/30/2022 9/30/2022 N/A N No
AF2-151 - Dillsburg 13.2 kV PA York Hess PA York Engineering and Procurement ME 3 3 1.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2151_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2151_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af2151_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af2151_wmpa.pdf Not Required N/A N/A 3/16/2020 N/A N/A 9/30/2022 9/30/2022 N/A N No
AF2-185 + Mercersburg-Milnor 34.5 kV II Elk Hill Solar 2 PA Franklin In Service APS 15 0 4.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2185_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2185_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/af2_185_isa.pdf Document Posted N/A Not Required N/A N/A 3/20/2020 N/A N/A 9/1/2022 9/1/2022 1/4/2021 N/A N No
AF2-185 - Mercersburg-Minor 34 kV II Elk Hill Solar 2 PA Franklin In Service APS 15 0 4.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2185_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2185_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/af2_185_isa.pdf Document Posted N/A Not Required N/A N/A 3/20/2020 N/A N/A 9/1/2022 9/1/2022 1/4/2021 N/A N No
AF2-186 + South Cecil 69 kV OH Paulding Active AEP 45 45 18.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2186_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2186_imp.pdf Document Posted In Progress N/A N/A 3/20/2020 N/A N/A 12/31/2023 N/A N No
AF2-186 - South Cecil 69 kV OH Paulding Active AEP 45 45 18.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2186_fea.pdf Document Posted In Progress N/A N/A 3/20/2020 N/A N/A 12/31/2023 N/A N No
AF2-187 + Brookside-Cloverdale 138 kV OH Wayne Active ATSI 130 130 78 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2187_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2187_imp.pdf Document Posted In Progress N/A N/A 3/22/2020 N/A N/A 6/30/2023 N/A N No
AF2-187 - Brookside-Cloverdale 138 kV OH Wayne Active ATSI 130 130 78 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2187_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2187_imp.pdf Document Posted In Progress N/A N/A 3/22/2020 N/A N/A 9/21/2020 6/30/2023 N/A N No
AF2-189 + Greentown 138 kV IN Howard Withdrawn AEP 150 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2189_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2189_imp.pdf Document Posted Withdrawn N/A N/A 3/22/2020 N/A N/A 9/17/2021 6/30/2023 N/A N No
AF2-189 - Greentown 138 kV IN Howard Active AEP 150 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2189_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2189_imp.pdf Document Posted In Progress N/A N/A 3/22/2020 N/A N/A 6/30/2023 N/A N No
AF2-221 + Scalp Level 22.9 kV PA Somerset Active PENELEC 15 15 6.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2221_fea.pdf Document Posted In Progress N/A N/A 3/25/2020 N/A N/A 3/15/2023 N/A N No
AF2-221 - Scalp Level 22.9 kV PA Somerset Active PENELEC 15 15 6.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2221_fea.pdf Document Posted In Progress N/A N/A 3/25/2020 N/A N/A 10/28/2020 3/15/2023 N/A N No
AF2-268 + Orrtanna 13.2 kV AD-Chambersburg PA Adams Suspended ME 2 2 0 Energy Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2268_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2268_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af2268_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af2268_wmpa.pdf Not Required N/A N/A 3/27/2020 N/A N/A 9/30/2022 9/30/2022 N/A Y No
AF2-268 - Orrtanna 13.2 kV AD-Chambersburg PA Adams Engineering and Procurement ME 2 2 0 Energy Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2268_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2268_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af2268_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af2268_wmpa.pdf Not Required N/A N/A 3/27/2020 N/A N/A 9/30/2022 9/30/2022 N/A Y No
AF2-271 + Pemberton-Sinking Valley 12.47 kV BL-Kettle PA Blair Suspended PENELEC 3 3 0 Energy Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2271_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2271_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af2271_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af2271_wmpa.pdf Not Required N/A N/A 3/27/2020 N/A N/A 9/30/2022 9/30/2022 N/A Y No
AF2-271 - Pemberton-Sinking Valley 12.47 kV BL-Kettle PA Blair Engineering and Procurement PENELEC 3 3 0 Energy Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2271_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2271_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af2271_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af2271_wmpa.pdf Not Required N/A N/A 3/27/2020 N/A N/A 9/30/2022 9/30/2022 N/A Y No
AF2-272 + Bernville 13.2 kV BR-Swissdale PA Blair Suspended ME 3 3 0 Energy Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2272_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2272_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af2272_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af2272_wmpa.pdf Not Required N/A N/A 3/27/2020 N/A N/A 9/30/2022 9/30/2022 N/A Y No
AF2-272 - Bernville 13.2 kV BR-Swissdale PA Blair Engineering and Procurement ME 3 3 0 Energy Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2272_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2272_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af2272_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af2272_wmpa.pdf Not Required N/A N/A 3/27/2020 N/A N/A 9/30/2022 9/30/2022 N/A Y No
AF2-276 + Guilford 12.47 kV FR-Statler PA Franklin Engineering and Procurement APS 3 3 0 Energy Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2276_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2276_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af2276_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af2276_wmpa.pdf Not Required N/A N/A 3/27/2020 N/A N/A 3/31/2023 3/31/2023 N/A Y No
AF2-276 - Guilford 12.47 kV PA Franklin Active APS 3 3 0 Energy Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2276_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2276_imp.pdf Document Posted Not Required Not Required N/A N/A 3/27/2020 N/A N/A 7/1/2021 N/A Y No
AF2-303 + Edgecombe 230 kV NC Edgecombe Active Dominion 100 100 100 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2303_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2303_imp.pdf Document Posted In Progress N/A N/A 3/30/2020 N/A N/A 8/3/2023 N/A N No This project slid to the next queue
AF2-303 - Edgecombe 230 kV NC Edgecombe Active Dominion 100 100 100 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2303_fea.pdf Document Posted In Progress N/A N/A 3/30/2020 N/A N/A 8/3/2023 N/A N No This project slid to the next queue
AF2-304 + Surry-Hopewell 230 kV VA Surry Active Dominion 89 89 89 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2304_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2304_imp.pdf Document Posted In Progress N/A N/A 3/30/2020 N/A N/A 8/3/2023 N/A N No This project slid to the next queue
AF2-304 - Surry-Hopewell 230 kV VA Surry Active Dominion 89 89 89 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2304_fea.pdf Document Posted In Progress N/A N/A 3/30/2020 N/A N/A 8/3/2023 N/A N No This project slid to the next queue
AF2-314 + Vandergrift-Guffy Junction 25 kV Ponytail Solar PA Armstrong Suspended APS 10 10 6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2314_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2314_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af2314_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af2314_wmpa.pdf Not Required N/A N/A 3/30/2020 N/A N/A 9/30/2023 9/30/2023 N/A N No
AF2-314 - Vandergrift-Guffy Junction 25 kV PA Armstrong Active APS 10 10 6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2314_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2314_imp.pdf Document Posted Not Required Not Required N/A N/A 3/30/2020 N/A N/A 9/1/2022 N/A N No
AF2-324 + Edgecombe 230 kV NC Edgecombe Active Dominion 75 75 48.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2324_fea.pdf Document Posted In Progress N/A N/A 3/30/2020 N/A N/A 11/30/2022 N/A N No
AF2-324 - Edgecombe 230 kV NC Edgecombe Active Dominion 75 75 48.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2324_fea.pdf Document Posted N/A N/A 3/30/2020 N/A N/A 11/30/2022 N/A N No
AF2-343 + Maysville 138 kV III PA Mercer Withdrawn ATSI 60 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2343_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2343_imp.pdf Document Posted Withdrawn N/A N/A 3/31/2020 N/A N/A 7/23/2021 12/31/2023 N/A N No
AF2-343 - Maysville 138 kV III PA Mercer Active ATSI 60 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2343_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2343_imp.pdf Document Posted Withdrawn N/A N/A 3/31/2020 N/A N/A 7/23/2021 12/31/2023 N/A N No
AF2-385 + Nelson 69 kV DE Sussex Withdrawn DPL 75 75 47.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2385_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2385_imp.pdf Document Posted Withdrawn N/A N/A 3/31/2020 N/A N/A 10/14/2021 10/31/2022 N/A N No
AF2-385 - Nelson 69 kV DE Sussex Active DPL 75 75 47.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2385_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2385_imp.pdf Document Posted In Progress N/A N/A 3/31/2020 N/A N/A 10/31/2022 N/A N No
AF2-395 + Flatlick 765 kV OH Vinton Active AEP 1045 51.1 89.6 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/af2395_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2395_imp.pdf Document Posted In Progress N/A N/A 3/31/2020 N/A N/A 5/1/2022 N/A N No
AF2-395 - Flatlick 765 kV OH Vinton Active AEP 1045 51.1 89.6 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/af2395_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2395_imp.pdf Document Posted In Progress N/A N/A 3/31/2020 N/A N/A 3/31/2021 5/1/2022 N/A N No
AF2-398 + Necessity-Dinnerbell 12.47 kV Fike Solar PA Fayette Engineering and Procurement APS 3 3 1.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2398_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2398_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af2398_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af2398_wmpa.pdf Not Required N/A N/A 3/31/2020 N/A N/A 9/30/2023 9/30/2023 N/A N No
AF2-398 - Necessity-Dinnerbell 12.47 kV PA Fayette Active APS 3 3 1.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2398_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2398_imp.pdf Document Posted Not Required Not Required N/A N/A 3/31/2020 N/A N/A 12/31/2021 N/A N No
AF2-412 + Mainesburg 115 kV PA Tioga Active PENELEC 130 130 130 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2412_fea.pdf Document Posted Withdrawn N/A N/A 3/31/2020 N/A N/A 6/1/2022 N/A N No
AF2-412 - Mainesburg 115 kV PA Tioga Active PENELEC 130 130 130 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2412_fea.pdf Document Posted In Progress N/A N/A 3/31/2020 N/A N/A 6/1/2022 N/A N No
AF2-419 + Hunt Farm-Ballard 69 kV KY Boyle Withdrawn EKPC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2419_fea.pdf Document Posted Withdrawn N/A N/A 3/31/2020 N/A N/A 9/14/2020 11/1/2021 N/A N No
AF2-419 - Hunt Farm-Ballard 69 kV KY Boyle Withdrawn EKPC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2419_fea.pdf Document Posted In Progress N/A N/A 3/31/2020 N/A N/A 9/14/2020 11/1/2021 N/A N No
AG1-001 + US Silica-Unimin 69 kV NJ Cumberland Active AEC 31 31 11.78 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1001_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1001_imp.pdf Document Posted In Progress N/A N/A 4/3/2020 N/A N/A 3/1/2023 N/A N No
AG1-001 - US Silica-Unimin 69 kV NJ Cumberland Active AEC 31 31 11.78 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1001_fea.pdf Document Posted In Progress N/A N/A 4/3/2020 N/A N/A 3/1/2023 N/A N No
AG1-003 + Marysville-Sorenson 765 kV OH Logan Active AEP 900 400 226 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1003_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1003_imp.pdf Document Posted In Progress N/A N/A 4/20/2020 N/A N/A 12/31/2023 N/A N No
AG1-003 - Marysville-Sorenson 765 kV OH Logan Active AEP 900 400 226 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1003_fea.pdf Document Posted In Progress N/A N/A 4/20/2020 N/A N/A 12/31/2023 N/A N No
AG1-004 + Marysville-Sorenson 765 kV OH Logan Active AEP 1100 200 200 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1004_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1004_imp.pdf Document Posted In Progress N/A N/A 4/20/2020 N/A N/A 12/31/2023 N/A N No
AG1-004 - Marysville-Sorenson 765 kV OH Logan Active AEP 1100 200 200 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1004_fea.pdf Document Posted In Progress N/A N/A 4/20/2020 N/A N/A 12/31/2023 N/A N No
AG1-007 + Tar River 12.5 kV NC Edgecombe Active Dominion 9.4 9.4 6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1007_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1007_imp.pdf Document Posted In Progress N/A N/A 5/1/2020 N/A N/A 12/15/2021 N/A N No
AG1-007 - Tar River 12.5 kV NC Edgecombe Active Dominion 9.4 9.4 6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1007_fea.pdf Document Posted In Progress N/A N/A 5/1/2020 N/A N/A 12/15/2021 N/A N No
AG1-009 + Hopewell-Surry 230kV VA Surry Active Dominion 150 0 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1009_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1009_imp.pdf Document Posted In Progress N/A N/A 5/4/2020 N/A N/A 6/30/2022 N/A N No
AG1-009 - Hopewell-Surry 230kV VA Surry Active Dominion 150 0 0 Energy Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1009_fea.pdf Document Posted In Progress N/A N/A 5/4/2020 N/A N/A 6/30/2022 N/A N No
AG1-010 + Ladysmith-CT-St. Johns 230 kV VA Caroline Active Dominion 180 0 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1010_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1010_imp.pdf Document Posted In Progress N/A N/A 5/5/2020 N/A N/A 6/30/2022 N/A N No
AG1-010 - Ladysmith-CT-St. Johns 230 kV VA Caroline Active Dominion 180 0 0 Energy Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1010_fea.pdf Document Posted In Progress N/A N/A 5/5/2020 N/A N/A 6/30/2022 N/A N No
AG1-012 + Mewdow Brook-Strasburg 138 kV II VA Frederick Active APS 75 0 0 Energy Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1012_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1012_imp.pdf Document Posted In Progress N/A N/A 5/8/2020 N/A N/A 6/30/2022 N/A N No
AG1-012 - Mewdow Brook-Strasburg 138 kV II VA Frederick Active APS 75 0 0 Energy Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1012_fea.pdf Document Posted In Progress N/A N/A 5/8/2020 N/A N/A 6/30/2022 N/A N No
AG1-013 + Ladysmith CT-St. Johns 230 kV VA Caroline Active Dominion 120 0 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1013_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1013_imp.pdf Document Posted In Progress N/A N/A 5/8/2020 N/A N/A 6/30/2022 N/A N No
AG1-013 - Ladysmith CT-St. Johns 230 kV VA Caroline Active Dominion 120 0 0 Energy Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1013_fea.pdf Document Posted In Progress N/A N/A 5/8/2020 N/A N/A 6/30/2022 N/A N No
AG1-014 + Carson-Rogers Rd 500 kV VA Greensville Active Dominion 500 0 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1014_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1014_imp.pdf Document Posted In Progress N/A N/A 5/8/2020 N/A N/A 12/1/2021 N/A N No
AG1-014 - Carson-Rogers Rd 500 kV VA Greensville Active Dominion 500 0 0 Energy Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1014_fea.pdf Document Posted In Progress N/A N/A 5/8/2020 N/A N/A 12/1/2021 N/A N No
AG1-015 + Carson-Rogers Rd 500 kV VA Greensville Active Dominion 400 0 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1015_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1015_imp.pdf Document Posted In Progress N/A N/A 5/8/2020 N/A N/A 12/1/2021 N/A N No
AG1-015 - Carson-Rogers Rd 500 kV VA Greensville Active Dominion 400 0 0 Energy Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1015_fea.pdf Document Posted In Progress N/A N/A 5/8/2020 N/A N/A 12/1/2021 N/A N No
AG1-017 + Jay 138 kV IN Jay Active AEP 146.6 16.64 2.93 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1017_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1017_imp.pdf Document Posted In Progress N/A N/A 5/6/2020 N/A N/A 9/30/2020 N/A N No
AG1-017 - Jay 138 kV IN Jay Active AEP 146.6 16.64 2.93 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1017_fea.pdf Document Posted In Progress N/A N/A 5/6/2020 N/A N/A 9/30/2020 N/A N No
AG1-019 + Arnold’s Corner-Dahlgren 230 kV VA King George Active Dominion 200 100 100 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1019_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1019_imp.pdf Document Posted In Progress N/A N/A 5/20/2020 N/A N/A 10/31/2023 N/A N No
AG1-019 - Arnold’s Corner-Dahlgren 230 kV VA King George Active Dominion 200 100 100 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1019_fea.pdf Document Posted In Progress N/A N/A 5/20/2020 N/A N/A 10/31/2023 N/A N No
AG1-021 + Jetersville-Ponton 115 kV VA Amelia Active Dominion 86 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1021_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1021_imp.pdf Document Posted In Progress N/A N/A 5/26/2020 N/A N/A 12/12/2023 N/A N No
AG1-021 - Jetersville-Ponton 115 kV VA Amelia Active Dominion 86 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1021_fea.pdf Document Posted In Progress N/A N/A 5/26/2020 N/A N/A 12/12/2023 N/A N No
AG1-022 + Scottsville-Colleen 138 kV VA Albemarle Active AEP 95 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1022_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1022_imp.pdf Document Posted In Progress N/A N/A 5/26/2020 N/A N/A 12/12/2023 N/A N No
AG1-022 - Scottsville-Colleen 138 kV VA Albemarle Active AEP 95 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1022_fea.pdf Document Posted In Progress N/A N/A 5/26/2020 N/A N/A 12/12/2023 N/A N No
AG1-023 + North Anna-Louisa 230 kV VA Louisa Active Dominion 75 75 15 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1023_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1023_imp.pdf Document Posted In Progress N/A N/A 5/26/2020 N/A N/A 10/1/2023 N/A N No
AG1-023 - North Anna-Louisa 230 kV VA Louisa Active Dominion 75 75 15 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1023_fea.pdf Document Posted In Progress N/A N/A 5/26/2020 N/A N/A 10/1/2023 N/A N No
AG1-024 + Centerburg 138 kV OH Licking Active AEP 285 85 35.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1024_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1024_imp.pdf Document Posted In Progress N/A N/A 6/1/2020 N/A N/A 10/31/2023 N/A N No
AG1-024 - Centerburg 138 kV OH Licking Active AEP 285 85 35.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1024_fea.pdf Document Posted In Progress N/A N/A 6/1/2020 N/A N/A 10/31/2023 N/A N No
AG1-027 + Suffolk-Holland 115 kV VA City of Suffolk Withdrawn Dominion 127.5 127.5 82.11 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1027_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1027_imp.pdf Document Posted Withdrawn N/A N/A 6/8/2020 N/A N/A 9/27/2021 12/31/2024 N/A N No
AG1-027 - Suffolk-Holland 115 kV VA City of Suffolk Active Dominion 127.5 127.5 82.11 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1027_fea.pdf Document Posted In Progress N/A N/A 6/8/2020 N/A N/A 12/31/2024 N/A N No
AG1-028 + Suffolk-Holland 115 kV VA City of Suffolk Withdrawn Dominion 127.5 0 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1028_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1028_imp.pdf Document Posted N/A N/A 6/8/2020 N/A N/A 9/27/2021 12/31/2024 N/A N No
AG1-028 - Suffolk-Holland 115 kV VA City of Suffolk Active Dominion 127.5 0 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1028_fea.pdf Document Posted In Progress N/A N/A 6/8/2020 N/A N/A 12/31/2024 N/A N No
AG1-029 + Weirton Solar 24 kV WV Hancock Active APS 30 30 13.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1029_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1029_imp.pdf Document Posted In Progress N/A N/A 6/9/2020 N/A N/A 11/15/2021 N/A N No
AG1-029 - Weirton Solar 24 kV WV Hancock Active APS 30 30 13.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1029_fea.pdf Document Posted In Progress N/A N/A 6/9/2020 N/A N/A 11/15/2021 N/A N No
AG1-031 + Elk Run D.P.-Gainesville 230 kV VA Fauquier Active Dominion 90 20 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1031_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1031_imp.pdf Document Posted In Progress N/A N/A 6/10/2020 N/A N/A 11/30/2021 N/A N No
AG1-031 - Elk Run D.P.-Gainesville 230 kV VA Fauquier Active Dominion 90 20 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1031_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1031_imp.pdf Document Posted N/A N/A 6/10/2020 N/A N/A 11/30/2021 N/A N No
AG1-033 + Scalp Level 23 kV PA Somerset Withdrawn PENELEC 5 5 3.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1033_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1033_imp.pdf Document Posted N/A N/A 6/12/2020 N/A N/A 9/16/2021 12/31/2021 N/A N No
AG1-033 - Scalp Level 23 kV PA Somerset Active PENELEC 5 5 3.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1033_fea.pdf Document Posted In Progress N/A N/A 6/12/2020 N/A N/A 12/31/2021 N/A N No
AG1-034 + Centerburg 138 kV OH Licking Active AEP 127.5 127.5 53.55 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1034_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1034_imp.pdf Document Posted In Progress N/A N/A 6/12/2020 N/A N/A 10/31/2023 N/A N No
AG1-034 - Centerburg 138 kV OH Licking Active AEP 127.5 127.5 53.55 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1034_fea.pdf Document Posted In Progress N/A N/A 6/12/2020 N/A N/A 10/31/2023 N/A N No
AG1-037 + Ahoskie 34.5 kV NC Hertford Active Dominion 5 5 3 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1037_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1037_imp.pdf Document Posted In Progress N/A N/A 6/16/2020 N/A N/A 12/31/2021 N/A N No
AG1-037 - Ahoskie 34.5 kV NC Hertford Active Dominion 5 5 3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1037_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1037_imp.pdf Document Posted N/A N/A 6/16/2020 N/A N/A 12/31/2021 N/A N No
AG1-038 + Garner DP-Lancaster 115 kV VA Lancaster Active Dominion 176 45 18.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1038_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1038_imp.pdf Document Posted In Progress N/A N/A 6/16/2020 N/A N/A 12/31/2022 N/A N No
AG1-038 - Garner DP-Lancaster 115 kV VA Lancaster Active Dominion 176 45 18.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1038_fea.pdf Document Posted N/A N/A 6/16/2020 N/A N/A 12/31/2022 N/A N No
AG1-039 + Galion 138 kV OH Morrow Active ATSI 144 56 23.52 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1039_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1039_imp.pdf Document Posted In Progress N/A N/A 6/18/2020 N/A N/A 12/31/2023 N/A N No
AG1-039 - Galion 138 kV OH Morrow Active ATSI 144 56 23.52 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1039_fea.pdf Document Posted In Progress N/A N/A 6/18/2020 N/A N/A 12/31/2023 N/A N No
AG1-040 + Morgan Street-Mount Hope 34.5 kV PA Crawford Active PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1040_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1040_imp.pdf Document Posted N/A N/A 6/19/2020 N/A N/A 12/1/2022 N/A N No
AG1-040 - Morgan Street-Mount Hope 34.5 kV PA Crawford Active PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1040_fea.pdf Document Posted In Progress N/A N/A 6/19/2020 N/A N/A 12/1/2022 N/A N No
AG1-041 + Osterburg-Bedford North 23 kV PA Bedford Active PENELEC 12 12 7.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1041_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1041_imp.pdf Document Posted In Progress N/A N/A 6/25/2020 N/A N/A 12/15/2022 N/A N No
AG1-041 - Osterburg-Bedford North 23 kV PA Bedford Active PENELEC 12 12 7.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1041_fea.pdf Document Posted In Progress N/A N/A 6/25/2020 N/A N/A 12/15/2022 N/A N No
AG1-042 + Hayden 345 kV OH Franklin Withdrawn AEP 100 100 66.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1042_fea.pdf Document Posted Withdrawn N/A N/A 6/26/2020 N/A N/A 8/19/2021 12/1/2023 N/A N No
AG1-042 - Hayden 345 kV OH Franklin Active AEP 100 100 66.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1042_fea.pdf Document Posted In Progress N/A N/A 6/26/2020 N/A N/A 12/1/2023 N/A N No
AG1-043 + Sowego 115 kV VA Accomack Withdrawn Dominion 60 60 36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1043_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1043_imp.pdf Document Posted N/A N/A 6/26/2020 N/A N/A 10/1/2021 12/12/2023 N/A N No
AG1-043 - Sowego 115 kV VA Fauquier Active Dominion 60 60 36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1043_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1043_imp.pdf Document Posted N/A N/A 6/26/2020 N/A N/A 12/12/2023 N/A N No
AG1-044 + Whiteside County Rock River ESS IL Whiteside Under Construction ComEd 0.5 0.5 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1044_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1044_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1044_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1044_wmpa.pdf Not Required N/A N/A 7/1/2020 N/A N/A 4/30/2021 7/30/2021 7/30/2021 N/A Y No
AG1-044 - Whiteside County Rock River ESS IL Whiteside Engineering and Procurement ComEd 0.5 0.5 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1044_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1044_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1044_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1044_wmpa.pdf Not Required N/A N/A 7/1/2020 N/A N/A 4/30/2021 7/30/2021 7/30/2021 N/A Y No
AG1-045 + Redbud-Gaylord 34.5 kV VA Frederick Active APS 36 36 18 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1045_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1045_imp.pdf Document Posted In Progress N/A N/A 7/2/2020 N/A N/A 12/1/2023 N/A N No
AG1-045 - Redbud-Gaylord 34.5 kV VA Frederick Active APS 36 36 18 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1045_fea.pdf Document Posted In Progress N/A N/A 7/2/2020 N/A N/A 12/1/2023 N/A N No
AG1-047 + Jay 138 kV IN Jay Active AEP 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1047_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1047_imp.pdf Document Posted N/A N/A 7/13/2020 N/A N/A 10/1/2023 N/A N No
AG1-047 - Jay 138 kV IN Jay Active AEP 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1047_fea.pdf Document Posted In Progress N/A N/A 7/13/2020 N/A N/A 10/1/2023 N/A N No
AG1-049 + College Corner 138 kV OH Preble Active AEP 80 0 17.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1049_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1049_imp.pdf Document Posted In Progress N/A N/A 7/17/2020 N/A N/A 12/31/2021 N/A N No
AG1-049 - College Corner 138 kV OH Preble Active AEP 80 0 17.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1049_fea.pdf Document Posted In Progress N/A N/A 7/17/2020 N/A N/A 12/31/2021 N/A N No
AG1-050 + Milton 69 kV PA Northumberland Active PPL 90 20 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1050_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1050_imp.pdf Document Posted In Progress N/A N/A 7/17/2020 N/A N/A 6/30/2022 N/A N No
AG1-050 - Milton 69 kV PA Northumberland Active PPL 90 20 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1050_fea.pdf Document Posted In Progress N/A N/A 7/17/2020 N/A N/A 6/30/2022 N/A N No
AG1-051 + Maysville 69 kV III PA Mercer Active ATSI 88 20 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1051_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1051_imp.pdf Document Posted In Progress N/A N/A 7/17/2020 N/A N/A 6/30/2022 N/A N No
AG1-051 - Maysville 69 kV III PA Mercer Active ATSI 88 20 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1051_fea.pdf Document Posted In Progress N/A N/A 7/17/2020 N/A N/A 6/30/2022 N/A N No
AG1-052 + Zionsview-Middletown 115 kV II PA York Active ME 99.6 20 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1052_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1052_imp.pdf Document Posted In Progress N/A N/A 7/17/2020 N/A N/A 9/30/2021 N/A N No
AG1-052 - Zionsview-Middletown 115 kV II PA York Active ME 99.6 20 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1052_fea.pdf Document Posted In Progress N/A N/A 7/17/2020 N/A N/A 9/30/2021 N/A N No
AG1-054 + Potter-Harlan 69 kV PA Lawrence Active ATSI 40 40 25.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1054_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1054_imp.pdf Document Posted In Progress N/A N/A 7/21/2020 N/A N/A 5/1/2023 N/A N No
AG1-054 - Potter-Harlan 69 kV PA Lawrence Active ATSI 40 40 25.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1054_fea.pdf Document Posted In Progress N/A N/A 7/21/2020 N/A N/A 5/1/2023 N/A N No
AG1-057 + Harmony Village 230 kV VA Middlesex Active Dominion 100 20 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1057_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1057_imp.pdf Document Posted In Progress N/A N/A 7/27/2020 N/A N/A 12/31/2023 N/A N No
AG1-057 - Harmony Village 230 kV VA Middlesex Active Dominion 100 20 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1057_fea.pdf Document Posted In Progress N/A N/A 7/27/2020 N/A N/A 12/31/2023 N/A N No
AG1-059 + Robbins 138 kV PA Westmoreland Active APS 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1059_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1059_imp.pdf Document Posted In Progress N/A N/A 7/29/2020 N/A N/A 1/1/2023 N/A N No
AG1-059 - Robbins 138 kV PA Westmoreland Active APS 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1059_fea.pdf Document Posted In Progress N/A N/A 7/29/2020 N/A N/A 1/1/2023 N/A N No
AG1-060 + Eldred 69 kV PA Schuylkill Active PPL 174.8 174.8 25.7 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1060_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1060_imp.pdf Document Posted In Progress N/A N/A 7/29/2020 N/A N/A 5/31/2022 N/A N No
AG1-060 - Eldred 69 kV PA Schuylkill Active PPL 174.8 174.8 25.7 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1060_fea.pdf Document Posted In Progress N/A N/A 7/29/2020 N/A N/A 5/31/2022 N/A N No
AG1-061 + Laurel-Sharptown 69 kV DE Sussex Active DPL 109.3 109.3 65.58 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1061_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1061_imp.pdf Document Posted N/A N/A 7/29/2020 N/A N/A 12/31/2021 N/A N No
AG1-061 - Laurel-Sharptown 69 kV DE Sussex Active DPL 109.3 109.3 65.58 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1061_fea.pdf Document Posted In Progress N/A N/A 7/29/2020 N/A N/A 12/31/2021 N/A N No
AG1-066 + Bonnyman 69 kV KY Perry Active AEP 80 80 48 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1066_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1066_imp.pdf Document Posted In Progress N/A N/A 7/30/2020 N/A N/A 10/2/2024 N/A N No
AG1-066 - Bonnyman 69 kV KY Perry Active AEP 80 80 48 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1066_fea.pdf Document Posted In Progress N/A N/A 7/30/2020 N/A N/A 10/2/2024 N/A N No
AG1-067 + Temple Hill 69 kV KY Barren Active EKPC 38 38 24.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1067_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1067_imp.pdf Document Posted In Progress N/A N/A 7/30/2020 N/A N/A 6/30/2023 N/A N No
AG1-067 - Temple Hill 69 kV KY Barren Active EKPC 38 38 24.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1067_fea.pdf Document Posted In Progress N/A N/A 7/30/2020 N/A N/A 6/30/2023 N/A N No
AG1-068 + London-Tangy 69 kV OH Adams Withdrawn ATSI 49.9 49.9 30.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1068_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1068_imp.pdf Document Posted N/A N/A 7/30/2020 N/A N/A 10/4/2021 6/30/2023 N/A N No
AG1-068 - London-Tangy 69 kV OH Madison Active ATSI 49.9 49.9 30.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1068_fea.pdf Document Posted In Progress N/A N/A 7/30/2020 N/A N/A 6/30/2023 N/A N No
AG1-070 + Bon Ayr 69 kV KY Barren Active EKPC 45 45 32.7 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1070_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1070_imp.pdf Document Posted In Progress N/A N/A 7/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-070 - Bon Ayr 69 kV KY Barren Active EKPC 45 45 32.7 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1070_fea.pdf Document Posted In Progress N/A N/A 7/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-071 + Bon Ayr 69 kV KY Barren Active EKPC 55 55 37.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1071_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1071_imp.pdf Document Posted In Progress N/A N/A 7/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-071 - Bon Ayr 69 kV KY Barren Active EKPC 55 55 37.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1071_fea.pdf Document Posted In Progress N/A N/A 7/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-072 + Hillsboro-Steele 138 kV II MD Queen Anne’s Withdrawn DPL 50 50 50 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1072_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1072_imp.pdf Document Posted N/A N/A 7/30/2020 N/A N/A 9/28/2021 12/1/2023 N/A N No
AG1-072 - Hillsboro-Steele 138 kV II MD Queen Anne’s Active DPL 150 50 50 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1072_fea.pdf Document Posted In Progress N/A N/A 7/30/2020 N/A N/A 12/1/2023 N/A N No
AG1-076 + Fostoria Central 138 kV OH Hancock Active AEP 205 0 46 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1076_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1076_imp.pdf Document Posted In Progress N/A N/A 7/31/2020 N/A N/A 12/29/2023 N/A N No
AG1-076 - Fostoria Central 138 kV OH Hancock Active AEP 205 0 46 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1076_fea.pdf Document Posted In Progress N/A N/A 7/31/2020 N/A N/A 12/29/2023 N/A N No
AG1-077 + Allegheny Tunnel 23 kV KY Magoffin Withdrawn PENELEC Energy Generation Interconnection Storage; Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1077_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1077_imp.pdf Document Posted N/A N/A 7/31/2020 N/A N/A 9/21/2021 5/31/2022 N/A Y No
AG1-077 - Allegheny Tunnel 23 kV PA Adams Active PENELEC 3.7 3.7 0 Energy Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1077_fea.pdf Document Posted In Progress N/A N/A 7/31/2020 N/A N/A 5/31/2022 N/A Y No
AG1-080 + Delair-Locust Street 69 kV NJ Camden Active PSEG 19.9 19.9 10.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1080_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1080_imp.pdf Document Posted In Progress N/A N/A 7/31/2020 N/A N/A 12/23/2022 N/A N No
AG1-080 - Delair-Locust Street 69 kV NJ Camden Active PSEG 19.9 19.9 10.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1080_fea.pdf Document Posted In Progress N/A N/A 7/31/2020 N/A N/A 12/23/2022 N/A N No
AG1-084 + Earlys 34.5 kV NC Hertford Withdrawn Dominion 17.5 17.5 10.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1084_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1084_imp.pdf Document Posted N/A N/A 7/31/2020 N/A N/A 10/8/2021 12/31/2021 N/A N No
AG1-084 - Earlys 34.5 kV NC Hertford Active Dominion 17.5 17.5 10.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1084_fea.pdf Document Posted In Progress N/A N/A 7/31/2020 N/A N/A 12/31/2021 N/A N No
AG1-085 + Earlys 34.5 NC Hertford Withdrawn Dominion 17.5 17.5 10.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1085_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1085_imp.pdf Document Posted N/A N/A 7/31/2020 N/A N/A 10/8/2021 12/31/2021 N/A N No
AG1-085 - Earlys 34.5 NC Hertford Active Dominion 17.5 17.5 10.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1085_fea.pdf Document Posted In Progress N/A N/A 7/31/2020 N/A N/A 12/31/2021 N/A N No
AG1-087 + Milford-Cartanza 230 kV DE Sussex Active DPL 440 440 119 Capacity Generation Interconnection Offshore Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1087_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1087_imp.pdf Document Posted N/A N/A 7/31/2020 N/A N/A 10/31/2026 N/A N No
AG1-087 - Milford-Cartanza 230 kV DE Sussex Active DPL 440 440 119 Capacity Generation Interconnection Offshore Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1087_fea.pdf Document Posted In Progress N/A N/A 7/31/2020 N/A N/A 10/31/2026 N/A N No
AG1-088 + Carll’s Corner-Sherman Ave 69 kV NJ Cumberland Active AEC 0 0 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1088_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1088_imp.pdf Document Posted In Progress N/A N/A 7/31/2020 N/A N/A 12/31/2021 N/A N No
AG1-088 - Carll’s Corner-Sherman Ave 69 kV NJ Cumberland Active AEC 0 0 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1088_fea.pdf Document Posted In Progress N/A N/A 7/31/2020 N/A N/A 12/31/2021 N/A N No
AG1-089 + Grandview-Clifftop 138 kV WV N/A Active AEP 120 30 12 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1089_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1089_imp.pdf Document Posted In Progress N/A N/A 7/31/2020 N/A N/A 12/31/2021 N/A N No
AG1-089 - Grandview-Clifftop 138 kV WV N/A Active AEP 120 30 12 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1089_fea.pdf Document Posted In Progress N/A N/A 7/31/2020 N/A N/A 12/31/2021 N/A N No
AG1-091 + Hickman-River Bend 69 kV VA Pulaski Active AEP 50 50 32.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1091_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1091_imp.pdf Document Posted In Progress N/A N/A 7/31/2020 N/A N/A 6/30/2023 N/A N No
AG1-091 - Hickman-River Bend 69 kV VA Pulaski Active AEP 50 50 32.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1091_fea.pdf Document Posted In Progress N/A N/A 7/31/2020 N/A N/A 6/30/2023 N/A N No
AG1-092 + Hickman-River Bend 69 kV VA Pulaski Withdrawn AEP 50 0 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1092_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1092_imp.pdf Document Posted N/A N/A 7/31/2020 N/A N/A 10/4/2021 6/30/2023 N/A N No
AG1-092 - Hickman-River Bend 69 kV VA Pulaski Active AEP 50 0 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1092_fea.pdf Document Posted In Progress N/A N/A 7/31/2020 N/A N/A 6/30/2023 N/A N No
AG1-094 + Burches Hill 230 kV MD Prince George’s Active PEPCO 265.3 35.3 0 Energy Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1094_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1094_imp.pdf Document Posted In Progress N/A N/A 8/7/2020 N/A N/A 8/31/2021 N/A N No
AG1-094 - Burches Hill 230 kV MD Prince George’s Active PEPCO 265.3 35.3 0 Energy Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1094_fea.pdf Document Posted In Progress N/A N/A 8/7/2020 N/A N/A 8/31/2021 N/A N No
AG1-096 + Rineyville 69 kV KY Hardin Active EKPC 55 55 36.6667 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1096_fea.pdf Document Posted N/A N/A 8/14/2020 N/A N/A 10/31/2023 N/A N No
AG1-096 - Rineyville 69 kV KY Hardin Active EKPC 55 55 36.6667 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 8/14/2020 N/A N/A 10/31/2023 N/A N No
AG1-100 + Venango-Saegertown 34.5 kV PA Crawford Active PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1100_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1100_imp.pdf Document Posted In Progress N/A N/A 8/18/2020 N/A N/A 12/15/2022 N/A N No
AG1-100 - Venango-Saegertown 34.5 kV PA Crawford Active PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1100_fea.pdf Document Posted In Progress N/A N/A 8/18/2020 N/A N/A 12/15/2022 N/A N No
AG1-101 + Oakland-Gorman 69 kV MD Garrett Active APS 20 10 6.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1101_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1101_imp.pdf Document Posted In Progress N/A N/A 8/20/2020 N/A N/A 6/1/2022 N/A N No
AG1-101 - Oakland-Gorman 69 kV MD Garrett Active APS 27 10 6.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1101_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1101_imp.pdf Document Posted In Progress N/A N/A 8/20/2020 N/A N/A 6/1/2022 N/A N No
AG1-102 + White Marsh 34.5 kV VA Gloucester Active Dominion 19 19 6.16 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1102_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1102_imp.pdf Document Posted In Progress N/A N/A 8/21/2020 N/A N/A 7/1/2022 N/A N No
AG1-102 - White Marsh 34.5 kV VA Gloucester Active Dominion 19 19 6.16 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1102_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1102_imp.pdf Document Posted N/A N/A 8/21/2020 N/A N/A 7/1/2022 N/A N No
AG1-103 + Clayton-Williamstown 69 kV NJ Gloucester Active AEC 44 0 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1103_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1103_imp.pdf Document Posted In Progress N/A N/A 8/24/2020 N/A N/A 6/30/2022 N/A N No
AG1-103 - Clayton-Williamstown 69 kV NJ Gloucester Active AEC 44 0 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1103_fea.pdf Document Posted In Progress N/A N/A 8/24/2020 N/A N/A 6/30/2022 N/A N No
AG1-104 + Waugh Chapel 230 kV MD Anne Arundel Active BGE 300 300 120 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1104_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1104_imp.pdf Document Posted In Progress N/A N/A 8/25/2020 N/A N/A 6/1/2024 N/A N No
AG1-104 - Waugh Chapel 230 kV MD Anne Arundel Active BGE 300 300 120 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1104_fea.pdf Document Posted In Progress N/A N/A 8/25/2020 N/A N/A 6/1/2024 N/A N No
AG1-107 + Hillsboro-Middleboro 138 kV OH Highland Active AEP 200 150 85.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1107_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1107_imp.pdf Document Posted In Progress N/A N/A 8/31/2020 N/A N/A 12/31/2023 N/A N No
AG1-107 - Hillsboro-Middleboro 138 kV OH Highland Active AEP 200 150 85.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1107_fea.pdf Document Posted In Progress N/A N/A 8/31/2020 N/A N/A 12/31/2023 N/A N No
AG1-109 + Valley 138 kV MI Van Buren Active AEP 50 0 25 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1109_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1109_imp.pdf Document Posted In Progress N/A N/A 8/31/2020 N/A N/A 3/1/2022 N/A N No
AG1-109 - Valley 138 kV MI Van Buren Active AEP 50 0 25 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1109_fea.pdf Document Posted In Progress N/A N/A 8/31/2020 N/A N/A 3/1/2022 N/A N No
AG1-110 + Silver Lake 69 kV NJ Camden Active AEC 40 0 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1110_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1110_imp.pdf Document Posted In Progress N/A N/A 8/31/2020 N/A N/A 11/1/2022 N/A N No
AG1-110 - Silver Lake 69 kV NJ Camden Active AEC 40 0 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1110_fea.pdf Document Posted In Progress N/A N/A 8/31/2020 N/A N/A 11/1/2022 N/A N No
AG1-115 + Buxmont 69 kV PA Bucks Active PPL 200 0 100 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1115_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1115_imp.pdf Document Posted In Progress N/A N/A 8/31/2020 N/A N/A 11/1/2022 N/A N No
AG1-115 - Buxmont 69 kV PA Bucks Active PPL 200 0 100 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1115_fea.pdf Document Posted In Progress N/A N/A 8/31/2020 N/A N/A 11/1/2022 N/A N No
AG1-116 + Newport-South Millville 69 kV NJ Cumberland Active AEC 59.7 0 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1116_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1116_imp.pdf Document Posted In Progress N/A N/A 8/31/2020 N/A N/A 12/3/2021 N/A N No
AG1-116 - Newport-South Millville 69 kV NJ Cumberland Active AEC 59.7 0 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1116_fea.pdf Document Posted N/A N/A 8/31/2020 N/A N/A 12/3/2021 N/A N No
AG1-117 + Churchtown-Upper Pittsgrove 138 kV NJ Salem Active AEC 149.3 0 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1117_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1117_imp.pdf Document Posted In Progress N/A N/A 8/31/2020 N/A N/A 12/3/2021 N/A N No
AG1-117 - Churchtown-Upper Pittsgrove 138 kV NJ Salem Active AEC 149.3 0 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1117_fea.pdf Document Posted In Progress N/A N/A 8/31/2020 N/A N/A 12/3/2021 N/A N No
AG1-123 + Amherst-Riverville138 kV VA Amherst Active AEP 75 75 44.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1123_fea.pdf Document Posted N/A N/A 8/31/2020 N/A N/A 12/1/2024 N/A N No
AG1-123 - Amherst-Riverville138 kV VA Amherst Active AEP 75 75 44.2 Capacity Generation Interconnection Solar In Progress N/A N/A 8/31/2020 N/A N/A 12/1/2024 N/A N No
AG1-125 + Marysville-Flatlick 765 kV OH Madison Active AEP 400 400 234.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1125_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1125_imp.pdf Document Posted In Progress N/A N/A 8/31/2020 N/A N/A 12/1/2024 N/A N No
AG1-125 - Marysville-Flatlick 765 kV OH Madison Active AEP 400 400 234.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1125_fea.pdf Document Posted In Progress N/A N/A 8/31/2020 N/A N/A 12/1/2024 N/A N No
AG1-126 + Marysville-Flatlick 765 kV OH Madison Active AEP 400 400 234.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1126_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1126_imp.pdf Document Posted In Progress N/A N/A 8/31/2020 N/A N/A 12/1/2024 N/A N No
AG1-126 - Marysville-Flatlick 765 kV OH Madison Active AEP 400 400 234.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1126_fea.pdf Document Posted In Progress N/A N/A 8/31/2020 N/A N/A 12/1/2024 N/A N No
AG1-129 + US Silica - Unimin 69 kV NJ Atlantic Withdrawn AEC 51 51 30.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1129_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1129_imp.pdf Document Posted N/A N/A 8/31/2020 N/A N/A 10/1/2021 6/1/2022 N/A N No
AG1-129 - US Silica - Unimin 69 kV NJ Cumberland Active AEC 51 51 30.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1129_fea.pdf Document Posted In Progress N/A N/A 8/31/2020 N/A N/A 6/1/2022 N/A N No
AG1-130 + Burlington 26 kV NAES NJ Burlington Engineering and Procurement PSEG 5 5 2 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1130_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1130_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ag1_130_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ag1_130_csa.pdf Document Posted N/A N/A 8/31/2020 N/A N/A 2/28/2023 2/28/2023 N/A N No
AG1-130 - Burlington 26 kV NJ Burlington Active PSEG 5 5 2 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1130_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1130_imp.pdf Document Posted In Progress N/A N/A 8/31/2020 N/A N/A 12/28/2022 N/A N No
AG1-131 + Edinburg 115 kV VA Shenandoah Active Dominion 25.6 25.6 15.36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1131_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1131_imp.pdf Document Posted In Progress N/A N/A 9/2/2020 N/A N/A 8/1/2022 N/A N No
AG1-131 - Edinburg 115 kV VA Shenandoah Active Dominion 25.6 25.6 15.36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1131_fea.pdf Document Posted N/A N/A 9/2/2020 N/A N/A 8/1/2022 N/A N No
AG1-132 + Tait 69 kV OH Montgomery Active Dayton 606 20 20 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1132_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1132_imp.pdf Document Posted In Progress N/A N/A 9/2/2020 N/A N/A 6/1/2021 N/A N No
AG1-132 - Tait 69 kV OH Montgomery Active Dayton 606 20 20 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1132_fea.pdf Document Posted In Progress N/A N/A 9/2/2020 N/A N/A 6/1/2021 N/A N No
AG1-133 + North Anna-Ladysmith 500 kV VA Spotsylvania Active Dominion 128 128 76.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1133_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1133_imp.pdf Document Posted In Progress N/A N/A 9/2/2020 N/A N/A 12/1/2024 N/A N No
AG1-133 - North Anna-Ladysmith 500 kV VA Spotsylvania Active Dominion 128 128 76.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1133_fea.pdf Document Posted In Progress N/A N/A 9/2/2020 N/A N/A 12/1/2024 N/A N No
AG1-134 + Kings Dominion DP 115 kV VA King William Active Dominion 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1134_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1134_imp.pdf Document Posted In Progress N/A N/A 9/2/2020 N/A N/A 12/1/2024 N/A N No
AG1-134 - Kings Dominion DP 115 kV VA King William Active Dominion 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1134_fea.pdf Document Posted In Progress N/A N/A 9/2/2020 N/A N/A 12/1/2024 N/A N No
AG1-135 + Garner-Lancaster 115 kV VA Richmond Active Dominion 60 60 36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1135_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1135_imp.pdf Document Posted In Progress N/A N/A 9/3/2020 N/A N/A 12/1/2024 N/A N No
AG1-135 - Garner-Lancaster 115 kV VA Richmond Active Dominion 60 60 36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1135_fea.pdf Document Posted In Progress N/A N/A 9/3/2020 N/A N/A 12/1/2024 N/A N No
AG1-136 + Cloverdale-Burlington Height 138 kV VA Botetourt Active AEP 100 100 40 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1136_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1136_imp.pdf Document Posted In Progress N/A N/A 9/3/2020 N/A N/A 10/22/2023 N/A N No
AG1-136 - Cloverdale-Burlington Height 138 kV VA Botetourt Active AEP 100 100 40 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1136_fea.pdf Document Posted In Progress N/A N/A 9/3/2020 N/A N/A 10/22/2023 N/A N No
AG1-137 + Harrisonburg 230 kV VA Rockingham Withdrawn Dominion 100 100 40 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1137_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1137_imp.pdf Document Posted N/A N/A 9/3/2020 N/A N/A 9/13/2021 10/22/2023 N/A N No
AG1-137 - Harrisonburg 230 kV VA Rockingham Active Dominion 100 100 40 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1137_fea.pdf Document Posted In Progress N/A N/A 9/3/2020 N/A N/A 10/22/2023 N/A N No
AG1-138 + Wolfs Corners 34.5 kV PA Clarion Withdrawn PENELEC 25 5 4.75 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1138_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1138_imp.pdf Document Posted N/A N/A 9/4/2020 N/A N/A 11/1/2021 9/15/2022 N/A N No
AG1-138 - Wolfs Corners 34.5 kV PA Clarion Active PENELEC 25 5 4.75 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1138_fea.pdf Document Posted In Progress N/A N/A 9/4/2020 N/A N/A 9/15/2022 N/A N No
AG1-139 + Clark Summit-Emlenton 34.5 kV PA Venango Withdrawn PENELEC 25 5 4.75 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1139_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1139_imp.pdf Document Posted N/A N/A 9/4/2020 N/A N/A 11/1/2021 9/15/2022 N/A N No
AG1-139 - Clark Summit-Emlenton 34.5 kV PA Venango Active PENELEC 25 5 4.75 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1139_fea.pdf Document Posted In Progress N/A N/A 9/4/2020 N/A N/A 9/15/2022 N/A N No
AG1-141 + Hempfield 12.47 kV Hempfield CSG 1 PA Westmoreland Suspended APS 5 5 2.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1141_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1141_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1141_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1141_wmpa.pdf Not Required N/A N/A 9/3/2020 N/A N/A 9/30/2022 9/30/2022 N/A N No
AG1-141 - Hempfield 12.47 kV Hempfield CSG 1 PA Westmoreland Engineering and Procurement APS 5 5 2.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1141_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1141_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1141_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1141_wmpa.pdf Not Required N/A N/A 9/3/2020 N/A N/A 9/30/2022 9/30/2022 N/A N No
AG1-143 + Gainesville-Loudoun 230 kV VA Prince William Active Dominion 200 200 80 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1143_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1143_imp.pdf Document Posted In Progress N/A N/A 9/4/2020 N/A N/A 10/22/2023 N/A N No
AG1-143 - Gainesville-Loudoun 230 kV VA Prince William Active Dominion 200 200 80 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1143_fea.pdf Document Posted In Progress N/A N/A 9/4/2020 N/A N/A 10/22/2023 N/A N No
AG1-146 + Garner DP-Lancaster 115 kV VA Lancaster Active Dominion 30 30 18 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1146_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1146_imp.pdf Document Posted In Progress N/A N/A 9/9/2020 N/A N/A 12/1/2024 N/A N No
AG1-146 - Garner DP-Lancaster 115 kV VA Lancaster Active Dominion 30 30 18 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1146_fea.pdf Document Posted In Progress N/A N/A 9/9/2020 N/A N/A 12/1/2024 N/A N No
AG1-147 + Garner DP-Lancaster 115 kV VA Lancaster Active Dominion 70 70 42 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1147_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1147_imp.pdf Document Posted In Progress N/A N/A 9/9/2020 N/A N/A 12/1/2024 N/A N No
AG1-147 - Garner DP-Lancaster 115 kV VA Lancaster Active Dominion 70 70 42 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1147_fea.pdf Document Posted In Progress N/A N/A 9/9/2020 N/A N/A 12/1/2024 N/A N No
AG1-150 + Wattsville 69 kV II VA Accomack Active DPL 80 40 40 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1150_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1150_imp.pdf Document Posted In Progress N/A N/A 9/9/2020 N/A N/A 12/1/2021 N/A N No
AG1-150 - Wattsville 69 kV II VA Accomack Active DPL 80 40 40 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1150_fea.pdf Document Posted In Progress N/A N/A 9/9/2020 N/A N/A 12/1/2021 N/A N No
AG1-151 + Endless Caverns 115 kV VA Rockingham Active Dominion 300 100 100 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1151_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1151_imp.pdf Document Posted In Progress N/A N/A 9/9/2020 N/A N/A 10/30/2023 N/A N No
AG1-151 - Endless Caverns 115 kV VA Rockingham Active Dominion 300 100 100 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1151_fea.pdf Document Posted In Progress N/A N/A 9/9/2020 N/A N/A 10/30/2023 N/A N No
AG1-152 + Remington CT 230 kV VA Fauquier Active Dominion 100 100 40 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1152_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1152_imp.pdf Document Posted In Progress N/A N/A 9/10/2020 N/A N/A 12/1/2023 N/A N No
AG1-152 - Remington CT 230 kV VA Fauquier Active Dominion 100 100 40 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1152_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1152_imp.pdf Document Posted N/A N/A 9/10/2020 N/A N/A 12/1/2023 N/A N No
AG1-153 + Heritage 500 kV VA Brunswick Active Dominion 75 75 30 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1153_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1153_imp.pdf Document Posted In Progress N/A N/A 9/10/2020 N/A N/A 12/1/2023 N/A N No
AG1-153 - Heritage 500 kV VA Brunswick Active Dominion 75 75 30 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1153_fea.pdf Document Posted In Progress N/A N/A 9/10/2020 N/A N/A 12/1/2023 N/A N No
AG1-154 + Ladysmith CT 230 kV VA Caroline Active Dominion 50 50 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1154_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1154_imp.pdf Document Posted In Progress N/A N/A 9/10/2020 N/A N/A 12/1/2023 N/A N No
AG1-154 - Ladysmith CT 230 kV VA Caroline Active Dominion 50 50 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1154_fea.pdf Document Posted In Progress N/A N/A 9/10/2020 N/A N/A 12/1/2023 N/A N No
AG1-156 + Jack Frost-Lake Harmony 69 kV PA Carbon Active PPL 60 60 39.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1156_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1156_imp.pdf Document Posted In Progress N/A N/A 9/10/2020 N/A N/A 6/15/2024 N/A N No
AG1-156 - Jack Frost-Lake Harmony 69 kV PA Carbon Active PPL 60 60 39.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1156_fea.pdf Document Posted In Progress N/A N/A 9/10/2020 N/A N/A 6/15/2024 N/A N No
AG1-157 + Macungie-Emmaus Tie 69 kV PA Lehigh Active PPL 7.4 7.37 0 Energy Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1157_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1157_imp.pdf Document Posted In Progress N/A N/A 9/11/2020 N/A N/A 6/16/2022 N/A N No
AG1-157 - Macungie-Emmaus Tie 69 kV PA Lehigh Active PPL 7.4 7.37 0 Energy Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1157_fea.pdf Document Posted In Progress N/A N/A 9/11/2020 N/A N/A 6/16/2022 N/A N No
AG1-160 + Rogers Road 500 kV VA Greensville Active Dominion 75 75 30 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1160_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1160_imp.pdf Document Posted In Progress N/A N/A 9/11/2020 N/A N/A 12/1/2023 N/A N No
AG1-160 - Rogers Road 500 kV VA Greensville Active Dominion 75 75 30 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1160_fea.pdf Document Posted In Progress N/A N/A 9/11/2020 N/A N/A 12/1/2023 N/A N No
AG1-162 + Sporn 138 kV WV Mason Active AEP 33.4 33.4 17.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1162_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1162_imp.pdf Document Posted In Progress N/A N/A 9/14/2020 N/A N/A 12/1/2022 N/A N No
AG1-162 - Sporn 138 kV WV Mason Active AEP 33.4 33.4 17.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1162_fea.pdf Document Posted In Progress N/A N/A 9/14/2020 N/A N/A 12/1/2022 N/A N No
AG1-164 + East Hazelton-Weatherly Tap 69 kV PA Luzerne Active PPL 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1164_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1164_imp.pdf Document Posted In Progress N/A N/A 9/16/2020 N/A N/A 8/15/2022 N/A N No
AG1-164 - East Hazelton-Weatherly Tap 69 kV PA Luzerne Active PPL 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1164_fea.pdf Document Posted In Progress N/A N/A 9/16/2020 N/A N/A 8/15/2022 N/A N No
AG1-165 + East Hazelton-Weatherly Tap 69 kV PA Luzerne Active PPL 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1165_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1165_imp.pdf Document Posted In Progress N/A N/A 9/16/2020 N/A N/A 5/15/2022 N/A N No
AG1-165 - East Hazelton-Weatherly Tap 69 kV PA Luzerne Active PPL 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1165_fea.pdf Document Posted In Progress N/A N/A 9/16/2020 N/A N/A 5/15/2022 N/A N No
AG1-166 + Lone Pine 115 kV VA Nottoway Active Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1166_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1166_imp.pdf Document Posted In Progress N/A N/A 9/16/2020 N/A N/A 10/15/2021 N/A N No
AG1-166 - Lone Pine 115 kV VA Nottoway Active Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1166_fea.pdf Document Posted In Progress N/A N/A 9/16/2020 N/A N/A 10/15/2021 N/A N No
AG1-167 + Lone Pine 115 kV VA Nottoway Active Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1167_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1167_imp.pdf Document Posted In Progress N/A N/A 9/16/2020 N/A N/A 10/15/2021 N/A N No
AG1-167 - Lone Pine 115 kV VA Nottoway Active Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1167_fea.pdf Document Posted In Progress N/A N/A 9/16/2020 N/A N/A 10/15/2021 N/A N No
AG1-168 + Lone Pine 115 kV VA Nottoway Active Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1168_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1168_imp.pdf Document Posted In Progress N/A N/A 9/16/2020 N/A N/A 10/15/2021 N/A N No
AG1-168 - Lone Pine 115 kV VA Nottoway Active Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1168_fea.pdf Document Posted In Progress N/A N/A 9/16/2020 N/A N/A 10/15/2021 N/A N No
AG1-169 + Lone Pine 115 kV VA Nottoway Active Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1169_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1169_imp.pdf Document Posted In Progress N/A N/A 9/16/2020 N/A N/A 10/15/2021 N/A N No
AG1-169 - Lone Pine 115 kV VA Nottoway Active Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1169_fea.pdf Document Posted In Progress N/A N/A 9/16/2020 N/A N/A 10/15/2021 N/A N No
AG1-170 + Lone Pine 115 kV VA Nottoway Active Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1170_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1170_imp.pdf Document Posted In Progress N/A N/A 9/16/2020 N/A N/A 10/15/2021 N/A N No
AG1-170 - Lone Pine 115 kV VA Nottoway Active Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1170_fea.pdf Document Posted In Progress N/A N/A 9/16/2020 N/A N/A 10/15/2021 N/A N No
AG1-180 + Brunswick-Gasburg 69 kV VA Sussex Active Dominion 50 0 16.4 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1180_fea.pdf Document Posted In Progress N/A N/A 9/17/2020 N/A N/A 6/30/2023 N/A N No
AG1-180 - Brunswick-Gasburg 69 kV VA Sussex Active Dominion 50 0 16.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1180_fea.pdf Document Posted In Progress N/A N/A 9/17/2020 N/A N/A 6/30/2023 N/A N No
AG1-182 + Millville-Old Chapel 138 kV VA Clarke Active APS 100 100 65.21 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1182_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1182_imp.pdf Document Posted In Progress N/A N/A 9/17/2020 N/A N/A 6/30/2023 N/A N No
AG1-182 - Millville-Old Chapel 138 kV VA Clarke Active APS 100 100 65.21 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1182_fea.pdf Document Posted In Progress N/A N/A 9/17/2020 N/A N/A 6/30/2023 N/A N No
AG1-183 + St. Johns DP-REC 115 kV VA King and Queen Withdrawn Dominion 50 50 35.52 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1183_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1183_imp.pdf Document Posted N/A N/A 9/17/2020 N/A N/A 9/1/2021 6/30/2023 N/A N No
AG1-183 - St. Johns DP-REC 115 kV VA King and Queen Active Dominion 50 50 35.52 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1183_fea.pdf Document Posted In Progress N/A N/A 9/17/2020 N/A N/A 6/30/2023 N/A N No
AG1-184 + Carson-Suffolk 500 kV VA Sussex Active Dominion 500 0 175.06 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1184_fea.pdf Document Posted In Progress N/A N/A 9/17/2020 N/A N/A 6/30/2023 N/A N No
AG1-184 - Carson-Suffolk 500 kV VA Sussex Active Dominion 500 0 175.06 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1184_fea.pdf Document Posted In Progress N/A N/A 9/17/2020 N/A N/A 6/30/2023 N/A N No
AG1-186 + Millville-Old Chapel 138 kV VA Clarke Active APS 100 0 34.79 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1186_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1186_imp.pdf Document Posted In Progress N/A N/A 9/17/2020 N/A N/A 6/30/2023 N/A N No
AG1-186 - Millville-Old Chapel 138 kV VA Clarke Active APS 100 0 34.79 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1186_fea.pdf Document Posted In Progress N/A N/A 9/17/2020 N/A N/A 6/30/2023 N/A N No
AG1-187 + St. Johns DP-REC 115 kV VA King and Queen Withdrawn Dominion 50 0 14.48 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1187_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1187_imp.pdf Document Posted N/A N/A 9/17/2020 N/A N/A 9/1/2021 6/30/2023 N/A N No
AG1-187 - St. Johns DP-REC 115 kV VA King and Queen Active Dominion 50 0 14.48 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1187_fea.pdf Document Posted In Progress N/A N/A 9/17/2020 N/A N/A 6/30/2023 N/A N No
AG1-191 + Chester-Pohatcong Mountain 34.5 kV NJ Morris Active JCPL 15.4 15.4 6.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1191_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1191_imp.pdf Document Posted In Progress N/A N/A 9/17/2020 N/A N/A 12/17/2021 N/A N No
AG1-191 - Chester-Pohatcong Mountain 34.5 kV NJ Morris Active JCPL 15.4 15.4 6.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1191_fea.pdf Document Posted In Progress N/A N/A 9/17/2020 N/A N/A 12/17/2021 N/A N No
AG1-193 + Utica Junction 34.5 kV PA Venango Active PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1193_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1193_imp.pdf Document Posted In Progress N/A N/A 9/17/2020 N/A N/A 1/15/2023 N/A N No
AG1-193 - Utica Junction 34.5 kV PA Venango Active PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1193_fea.pdf Document Posted In Progress N/A N/A 9/17/2020 N/A N/A 1/15/2023 N/A N No
AG1-194 + Nuttall 138 kV WV Fayette Active AEP 200 200 104 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1194_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1194_imp.pdf Document Posted In Progress N/A N/A 9/18/2020 N/A N/A 12/1/2023 N/A N No
AG1-194 - Nuttall 138 kV WV Fayette Active AEP 200 200 104 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1194_fea.pdf Document Posted In Progress N/A N/A 9/18/2020 N/A N/A 12/1/2023 N/A N No
AG1-195 + Valley 230 kV VA Augusta Active Dominion 150 150 150 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1195_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1195_imp.pdf Document Posted In Progress N/A N/A 9/18/2020 N/A N/A 12/31/2023 N/A N No
AG1-195 - Valley 230 kV VA Augusta Active Dominion 150 150 150 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1195_fea.pdf Document Posted In Progress N/A N/A 9/18/2020 N/A N/A 12/31/2023 N/A N No
AG1-196 + Grottoes 115 kV VA Augusta Active Dominion 150 150 150 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1196_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1196_imp.pdf Document Posted In Progress N/A N/A 9/18/2020 N/A N/A 12/31/2023 N/A N No
AG1-196 - Grottoes 115 kV VA Augusta Active Dominion 150 150 150 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1196_fea.pdf Document Posted In Progress N/A N/A 9/18/2020 N/A N/A 12/31/2023 N/A N No
AG1-197 + Morgan Street-Cochranton 34.5 kV PA Crawford Active PENELEC 15 15 9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1197_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1197_imp.pdf Document Posted In Progress N/A N/A 9/18/2020 N/A N/A 1/15/2023 N/A N No
AG1-197 - Morgan Street-Cochranton 34.5 kV PA Crawford Active PENELEC 15 15 9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1197_fea.pdf Document Posted In Progress N/A N/A 9/18/2020 N/A N/A 1/15/2023 N/A N No
AG1-198 + Union City 34.5 kV PA Erie Active PENELEC 12 12 7.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1198_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1198_imp.pdf Document Posted In Progress N/A N/A 9/18/2020 N/A N/A 1/15/2023 N/A N No
AG1-198 - Union City 34.5 kV PA Erie Active PENELEC 12 12 7.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1198_fea.pdf Document Posted In Progress N/A N/A 9/18/2020 N/A N/A 1/15/2023 N/A N No
AG1-202 + Springboro 12.47 kV PA Crawford Active PENELEC 10 10 6.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1202_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1202_imp.pdf Document Posted In Progress N/A N/A 9/22/2020 N/A N/A 12/31/2022 N/A N No
AG1-202 - Springboro 12.47 kV PA Crawford Active PENELEC 10 10 6.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1202_fea.pdf Document Posted In Progress N/A N/A 9/22/2020 N/A N/A 12/31/2022 N/A N No
AG1-203 + Reels Corner 23 kV PA Somerset Active PENELEC 10 10 6.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1203_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1203_imp.pdf Document Posted In Progress N/A N/A 9/22/2020 N/A N/A 12/31/2022 N/A N No
AG1-203 - Reels Corner 23 kV PA Somerset Active PENELEC 10 10 6.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1203_fea.pdf Document Posted In Progress N/A N/A 9/22/2020 N/A N/A 12/31/2022 N/A N No
AG1-205 + Rockwood 23 kV PA Somerset Active PENELEC 10 10 6.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1205_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1205_imp.pdf Document Posted In Progress N/A N/A 9/22/2020 N/A N/A 12/31/2022 N/A N No
AG1-205 - Rockwood 23 kV PA Somerset Active PENELEC 10 10 6.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1205_fea.pdf Document Posted In Progress N/A N/A 9/22/2020 N/A N/A 12/31/2022 N/A N No
AG1-207 + Vandalia 69 kV OH Montgomery Active Dayton 85 85 85 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1207_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1207_imp.pdf Document Posted In Progress N/A N/A 9/22/2020 N/A N/A 12/1/2022 N/A N No
AG1-207 - Vandalia 69 kV OH Montgomery Active Dayton 85 85 85 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1207_fea.pdf Document Posted In Progress N/A N/A 9/22/2020 N/A N/A 12/1/2022 N/A N No
AG1-209 + Gretna 12.5 kV VA Pittsylvania Active Dominion 7 7 2.8 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1209_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1209_imp.pdf Document Posted In Progress N/A N/A 9/22/2020 N/A N/A 12/30/2022 N/A N No
AG1-209 - Gretna 12.5 kV VA Pittsylvania Active Dominion 7 7 2.8 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1209_fea.pdf Document Posted In Progress N/A N/A 9/22/2020 N/A N/A 12/30/2022 N/A N No
AG1-210 + Northern Neck 34.5 kV VA Richmond Active Dominion 10 10 4 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1210_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1210_imp.pdf Document Posted In Progress N/A N/A 9/22/2020 N/A N/A 12/30/2022 N/A N No
AG1-210 - Northern Neck 34.5 kV VA Richmond Active Dominion 10 10 4 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1210_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1210_imp.pdf Document Posted N/A N/A 9/22/2020 N/A N/A 12/30/2022 N/A N No
AG1-213 + St Johns 13.2 kV Poplar Energy Storage VA Caroline Engineering and Procurement Dominion 10 10 4 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1213_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1213_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1213_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1213_wmpa.pdf Not Required N/A N/A 9/22/2020 N/A N/A 6/30/2024 6/30/2024 N/A N No
AG1-213 - St Johns 13.2 kV VA Caroline Active Dominion 10 10 4 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1213_fea.pdf Document Posted In Progress N/A N/A 9/22/2020 N/A N/A 12/31/2022 N/A N No
AG1-214 + Grottoes 12.5 kV VA Rockingham Active Dominion 19 19 7.6 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1214_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1214_imp.pdf Document Posted In Progress N/A N/A 9/22/2020 N/A N/A 12/31/2022 N/A N No
AG1-214 - Grottoes 12.5 kV VA Rockingham Active Dominion 19 19 7.6 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1214_fea.pdf Document Posted In Progress N/A N/A 9/22/2020 N/A N/A 12/31/2022 N/A N No
AG1-215 + Fort Pickett 13.2 kV VA Nottoway Active Dominion 14 14 5.6 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1215_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1215_imp.pdf Document Posted In Progress N/A N/A 9/22/2020 N/A N/A 12/30/2022 N/A N No
AG1-215 - Fort Pickett 13.2 kV VA Nottoway Active Dominion 14 14 5.6 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1215_fea.pdf Document Posted In Progress N/A N/A 9/22/2020 N/A N/A 12/30/2022 N/A N No
AG1-217 + Cent Hardin-Kargle 69 kV Upgrade KY Unknown Active EKPC Energy Merchant Transmission Not Required https://www.pjm.com/pub/planning/project-queues/arr-impact-studies/ag1217_arr-imp.pdf Document Posted In Progress N/A N/A 9/22/2020 N/A N/A 10/20/2020 N/A EE No
AG1-217 - Cent Hardin-Kargle 69 kV Upgrade KY Unknown Active EKPC Energy Merchant Transmission Not Required In Progress N/A N/A 9/22/2020 N/A N/A 10/20/2020 N/A EE No
AG1-218 + Marysville-Tangy 345 kV OH Union Active AEP 250 250 150 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1218_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1218_imp.pdf Document Posted In Progress N/A N/A 9/23/2020 N/A N/A 3/31/2024 N/A N No
AG1-218 - Marysville-Tangy 345 kV OH Union Active AEP 250 250 150 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1218_fea.pdf Document Posted In Progress N/A N/A 9/23/2020 N/A N/A 3/31/2024 N/A N No
AG1-219 + Layland 69 kV WV Fayette Active AEP 75 75 39.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1219_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1219_imp.pdf Document Posted In Progress N/A N/A 9/23/2020 N/A N/A 12/1/2023 N/A N No
AG1-219 - Layland 69 kV WV Fayette Active AEP 75 75 39.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1219_fea.pdf Document Posted In Progress N/A N/A 9/23/2020 N/A N/A 12/1/2023 N/A N No
AG1-221 + Poland Rd-Runway DP 230 kV VA Loudoun Active Dominion 50 50 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1221_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1221_imp.pdf Document Posted In Progress N/A N/A 9/23/2020 N/A N/A 6/1/2023 N/A N No
AG1-221 - Poland Rd-Runway DP 230 kV VA Loudoun Active Dominion 50 50 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1221_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1221_imp.pdf Document Posted N/A N/A 9/23/2020 N/A N/A 6/1/2023 N/A N No
AG1-222 + Guardian-Twin Branch 138 kV IN Elkhart Active AEP 302.2 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1222_fea.pdf Document Posted N/A N/A 9/23/2020 N/A N/A 5/31/2023 N/A N No
AG1-222 - Guardian-Twin Branch 138 kV IN Elkhart Active AEP 302.2 150 90 Capacity Generation Interconnection Solar In Progress N/A N/A 9/23/2020 N/A N/A 5/31/2023 N/A N No
AG1-223 + Larrabee-Allaire 34.5 kV NJ Monmouth Active JCPL 15.4 15.4 6.47 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1223_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1223_imp.pdf Document Posted In Progress N/A N/A 9/23/2020 N/A N/A 12/31/2021 N/A N No
AG1-223 - Larrabee-Allaire 34.5 kV NJ Monmouth Active JCPL 15.4 15.4 6.47 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1223_fea.pdf Document Posted In Progress N/A N/A 9/23/2020 N/A N/A 12/31/2021 N/A N No
AG1-227 + Altamont-Tuscarora 69 kV PA Schuylkill Active PPL 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1227_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1227_imp.pdf Document Posted In Progress N/A N/A 9/24/2020 N/A N/A 6/1/2023 N/A N No
AG1-227 - Altamont-Tuscarora 69 kV PA Schuylkill Active PPL 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1227_fea.pdf Document Posted In Progress N/A N/A 9/24/2020 N/A N/A 6/1/2023 N/A N No
AG1-228 + Alta Haute-Tuscarora 69 kV PA Schuylkill Active PPL 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1228_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1228_imp.pdf Document Posted In Progress N/A N/A 9/24/2020 N/A N/A 6/1/2023 N/A N No
AG1-228 - Alta Haute-Tuscarora 69 kV PA Schuylkill Active PPL 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1228_fea.pdf Document Posted In Progress N/A N/A 9/24/2020 N/A N/A 6/1/2023 N/A N No
AG1-231 + Glady Run–Xenia 69 kV OH Greene Active Dayton 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1231_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1231_imp.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 3/31/2023 N/A N No
AG1-231 - Glady Run–Xenia 69 kV OH Greene Active Dayton 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1231_fea.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 3/31/2023 N/A N No
AG1-232 + Magley 138 kV IN Adams Active AEP 135 135 81 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1232_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1232_imp.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 12/31/2024 N/A N No
AG1-232 - Magley 138 kV IN Adams Active AEP 135 135 81 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1232_fea.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 12/31/2024 N/A N No
AG1-237 + Dequine-Eugene 345 kV IN N/A Active AEP 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1237_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1237_imp.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 12/31/2024 N/A N No
AG1-237 - Dequine-Eugene 345 kV IN N/A Active AEP 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1237_fea.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 12/31/2024 N/A N No
AG1-239 + Blue Bell-South East Canton 138 kV OH Stark Active ATSI 150 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1239_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1239_imp.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 3/31/2024 N/A N No
AG1-239 - Blue Bell-South East Canton 138 kV OH Stark Active ATSI 150 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1239_fea.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 3/31/2024 N/A N No
AG1-246 + Gates Hill-Luzerne 25 kV PA Fayette Active APS 7.5 7.5 4.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1246_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1246_imp.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 12/31/2022 N/A N No
AG1-246 - Gates Hill-Luzerne 25 kV PA Fayette Active APS 7.5 7.5 4.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1246_fea.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 12/31/2022 N/A N No
AG1-248 + York Storage 115 kV PA York Active ME 170 119 4.8 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1248_fea.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 10/31/2022 N/A N No
AG1-248 - York Storage 115 kV PA York Active ME 200 149 13.8 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1248_fea.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 10/31/2022 N/A N No
AG1-251 + McDowell 12.47 kV PA Delaware Active ATSI 3.9 3.88 1.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1251_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1251_imp.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 12/31/2021 N/A N No
AG1-251 - McDowell 12.47 kV PA Delaware Active ATSI 3.9 3.88 1.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1251_fea.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 12/31/2021 N/A N No
AG1-254 + Salem-Woodstown 69 kV NJ Atlantic Active AEC 38 38 25.3 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1254_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1254_imp.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 12/31/2023 N/A N No
AG1-254 - Salem-Woodstown 69 kV NJ Salem Active AEC 70 70 46.6667 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1254_fea.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 12/31/2023 N/A N No
AG1-255 + Churchtown-Quinton 69 kV NJ Salem Active AEC 55 55 36.7 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1255_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1255_imp.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 12/31/2023 N/A N No
AG1-255 - Churchtown-Orchard 230 kV NJ Salem Active AEC 150 55 36.7 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1255_fea.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 12/31/2023 N/A N No
AG1-256 + Northern Neck 230 kV VA Accomack Withdrawn Dominion 20 20 8 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1256_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1256_imp.pdf Document Posted N/A N/A 9/28/2020 N/A N/A 10/5/2021 1/1/2023 N/A N No
AG1-256 - Northern Neck 230 kV VA Richmond Active Dominion 20 20 8 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1256_fea.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 1/1/2023 N/A N No
AG1-257 + Madisonburg Jct-Millheim 46 kV PA Centre Active APS 19.9 19.9 8.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1257_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1257_imp.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 8/1/2022 N/A N No
AG1-257 - Madisonburg Jct-Millheim 46 kV PA Centre Active APS 19.9 19.9 8.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1257_fea.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 8/1/2022 N/A N No
AG1-259 + Sunbury-Dalmatia 69 kV PA Northumberland Active PPL 19.9 19.9 8.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1259_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1259_imp.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 8/1/2022 N/A N No
AG1-259 - Sunbury-Dalmatia 69 kV PA Northumberland Active PPL 19.9 19.9 8.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1259_fea.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 8/1/2022 N/A N No
AG1-260 + Sunbury-Dalmatia 69 kV PA Northumberland Active PPL 39.8 19.9 8.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1260_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1260_imp.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 8/1/2023 N/A N No
AG1-260 - Sunbury-Dalmatia 69 kV PA Northumberland Active PPL 39.8 19.9 8.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1260_fea.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 8/1/2023 N/A N No
AG1-262 + Lower Mount Bethel 230 kV PA Northampton Active PPL 100 100 40 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1262_fea.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 10/31/2022 N/A N No
AG1-262 - Lower Mount Bethel 230 kV PA Northampton Active PPL 100 100 40 Capacity Generation Interconnection Storage In Progress N/A N/A 9/28/2020 N/A N/A 10/31/2022 N/A N No
AG1-263 + Gloucester 230 kV NJ Camden Active PSEG 20 20 8 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1263_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1263_imp.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 10/31/2021 N/A N No
AG1-263 - Gloucester 230 kV NJ Camden Active PSEG 20 20 8 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1263_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1263_imp.pdf Document Posted N/A N/A 9/28/2020 N/A N/A 10/31/2021 N/A N No
AG1-267 + Martins Creek 69 kV PA Northampton Active PPL 20 20 8 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1267_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1267_imp.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 10/31/2021 N/A N No
AG1-267 - Martins Creek 69 kV PA Northampton Active PPL 20 20 8 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1267_fea.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 10/31/2021 N/A N No
AG1-268 + Essex 230 kV NJ Essex Active PSEG 80 80 40.8 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1268_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1268_imp.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 10/31/2022 N/A N No
AG1-268 - Essex 230 kV NJ Essex Active PSEG 80 80 40.8 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1268_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1268_imp.pdf Document Posted N/A N/A 9/28/2020 N/A N/A 10/31/2022 N/A N No
AG1-277 + Salem-Beacon Power 69 kV PA Luzerne Active PPL 40 40 32 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1277_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1277_imp.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 6/1/2022 N/A N No
AG1-277 - Salem-Beacon Power 69 kV PA Luzerne Active PPL 40 40 32 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1277_fea.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 6/1/2022 N/A N No
AG1-278 + Salem-Beacon Power 69 kV PA Luzerne Active PPL 20 20 15.42 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1278_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1278_imp.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 6/1/2022 N/A N No
AG1-278 - Salem-Beacon Power 69 kV PA Luzerne Active PPL 20 20 15.42 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1278_fea.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 6/1/2022 N/A N No
AG1-279 + Salem-Beacon Power 69 kV PA Luzerne Active PPL 20 20 15.42 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1279_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1279_imp.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 6/1/2022 N/A N No
AG1-279 - Salem-Beacon Power 69 kV PA Luzerne Active PPL 20 20 15.42 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1279_fea.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 6/1/2022 N/A N No
AG1-280 + Claysburg-Puzzletown 46 kV PA Blair Active PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1280_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1280_imp.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 3/1/2022 N/A N No
AG1-280 - Claysburg-Puzzletown 46 kV PA Blair Active PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1280_fea.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 3/1/2022 N/A N No
AG1-281 + Claysburg-HCR Tap 46 kV PA Blair Active PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1281_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1281_imp.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 3/1/2022 N/A N No
AG1-281 - Claysburg-HCR Tap 46 kV PA Blair Active PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1281_fea.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 3/1/2022 N/A N No
AG1-282 + Dunnsville 34.5 kV VA Essex Active Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1282_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1282_imp.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 6/1/2022 N/A N No
AG1-282 - Dunnsville 34.5 kV VA Essex Active Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1282_fea.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 6/1/2022 N/A N No
AG1-283 + Effort Mountain-Gilbert 138 kV PA Monroe Active PPL 30 30 18 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1283_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1283_imp.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 9/30/2023 N/A N No
AG1-283 - Effort Mountain-Gilbert 138 kV PA Monroe Active PPL 30 30 18 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1283_fea.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 9/30/2023 N/A N No
AG1-289 + Lake of the Woods DP-Wilderness DP 115 kV VA Orange Active Dominion 150 0 53.41 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1289_fea.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 6/30/2023 N/A N No
AG1-289 - Lake of the Woods DP-Wilderness DP 115 kV VA Orange Active Dominion 150 0 53.41 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1289_fea.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 6/30/2023 N/A N No
AG1-290 + Wagner 115 kV MD Baltimore County Active BGE 20 20 4 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1290_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1290_imp.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 10/31/2021 N/A N No
AG1-290 - Wagner 115 kV MD Baltimore County Active BGE 20 20 4 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1290_fea.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 10/31/2021 N/A N No
AG1-291 + Neville 23 kV PA Allegheny Active DL 16.8 16.8 13.5 Capacity Generation Interconnection Hydro https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1291_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1291_imp.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 12/31/2023 N/A N No
AG1-291 - Neville 23 kV PA Allegheny Active DL 16.8 16.8 13.5 Capacity Generation Interconnection Hydro https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1291_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1291_imp.pdf Document Posted N/A N/A 9/28/2020 N/A N/A 12/31/2023 N/A N No
AG1-296 + Snyder Township 34.5 kV PA Jefferson Active PENELEC 10 10 6.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1296_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1296_imp.pdf Document Posted In Progress N/A N/A 9/29/2020 N/A N/A 12/31/2022 N/A N No
AG1-296 - Snyder Township 34.5 kV PA Jefferson Active PENELEC 10 10 6.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1296_fea.pdf Document Posted In Progress N/A N/A 9/29/2020 N/A N/A 12/31/2022 N/A N No
AG1-299 + U.S. Silica 12.47 kV NJ Atlantic Withdrawn AEC 3 3 1.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1299_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1299_imp.pdf Document Posted N/A N/A 9/29/2020 N/A N/A 10/1/2021 12/31/2021 N/A N No
AG1-299 - U.S. Silica 12.47 kV NJ Cumberland Active AEC 3 3 1.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1299_fea.pdf Document Posted In Progress N/A N/A 9/29/2020 N/A N/A 12/31/2021 N/A N No
AG1-300 + U.S Silica II 12.47 kV NJ Cumberland Withdrawn AEC 3 3 1.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1300_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1300_imp.pdf Document Posted N/A N/A 9/29/2020 N/A N/A 10/1/2021 12/31/2021 N/A N No
AG1-300 - U.S Silica II 12.47 kV NJ Cumberland Active AEC 5 5 3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1300_fea.pdf Document Posted In Progress N/A N/A 9/29/2020 N/A N/A 12/31/2021 N/A N No
AG1-303 + Geneva 115 kV PA Crawford Active PENELEC 44 44 26.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1303_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1303_imp.pdf Document Posted In Progress N/A N/A 9/29/2020 N/A N/A 9/25/2023 N/A N No
AG1-303 - Geneva 115 kV PA Crawford Active PENELEC 44 44 26.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1303_fea.pdf Document Posted In Progress N/A N/A 9/29/2020 N/A N/A 9/25/2023 N/A N No
AG1-305 + Louisa-North Anna 230 kV VA Louisa Active Dominion 118 118 70.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1305_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1305_imp.pdf Document Posted In Progress N/A N/A 9/29/2020 N/A N/A 7/1/2022 N/A N No
AG1-305 - Louisa-North Anna 230 kV VA Louisa Active Dominion 118 118 70.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1305_fea.pdf Document Posted In Progress N/A N/A 9/29/2020 N/A N/A 7/1/2022 N/A N No
AG1-307 + Old Chapel-Millville 138 kV WV Jefferson Active APS 80 80 56 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1307_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1307_imp.pdf Document Posted In Progress N/A N/A 9/29/2020 N/A N/A 6/30/2023 N/A N No
AG1-307 - Old Chapel-Millville 138 kV WV Jefferson Active APS 80 80 56 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1307_fea.pdf Document Posted In Progress N/A N/A 9/29/2020 N/A N/A 6/30/2023 N/A N No
AG1-308 + Shawville-Philipsburg 34.5 kV PA Clearfield Active PENELEC 19.9 19.9 8.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1308_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1308_imp.pdf Document Posted In Progress N/A N/A 9/29/2020 N/A N/A 8/1/2022 N/A N No
AG1-308 - Shawville-Philipsburg 34.5 kV PA Clearfield Active PENELEC 19.9 19.9 8.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1308_fea.pdf Document Posted In Progress N/A N/A 9/29/2020 N/A N/A 8/1/2022 N/A N No
AG1-311 + Apple Grove 138 kV WV Mason Active AEP 99 99 69.4 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1311_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1311_imp.pdf Document Posted In Progress N/A N/A 9/29/2020 N/A N/A 6/30/2023 N/A N No
AG1-311 - Apple Grove 138 kV WV Mason Active AEP 99 99 69.4 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1311_fea.pdf Document Posted In Progress N/A N/A 9/29/2020 N/A N/A 6/30/2023 N/A N No
AG1-315 + Lardin-Grays Landing 12.47 kV Woodside Solar PA Fayette Engineering and Procurement APS 2 2 0.84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1315_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1315_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1315_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1315_wmpa.pdf Not Required N/A N/A 9/29/2020 N/A N/A 9/30/2023 9/30/2023 N/A N No
AG1-315 - Lardin-Grays Landing 12.47 kV PA Fayette Active APS 2 2 0.84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1315_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1315_imp.pdf Document Posted Not Required Not Required N/A N/A 9/29/2020 N/A N/A 12/31/2021 N/A N No
AG1-322 + Birchwood 230 kV VA Accomack Withdrawn Dominion 70 70 70 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1322_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1322_imp.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 10/1/2021 9/1/2023 N/A N No
AG1-322 - Birchwood 230 kV VA King George Active Dominion 70 70 70 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1322_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 9/1/2023 N/A N No
AG1-323 + Blue Jacket 138 kV OH Logan Active Dayton 40 40 40 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1323_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1323_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 9/1/2023 N/A N No
AG1-323 - Blue Jacket 138 kV OH Logan Active Dayton 40 40 40 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1323_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 9/1/2023 N/A N No
AG1-324 + Jay-Desoto 138 kV IN Jay Active AEP 45 45 31.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1324_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1324_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 9/1/2023 N/A N No
AG1-324 - Jay-Desoto 138 kV IN Jay Active AEP 45 45 31.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1324_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 9/1/2023 N/A N No
AG1-327 + Ringgold – East Waynesboro 138 kV PA Franklin Withdrawn APS 35 35 23.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1327_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1327_imp.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 11/1/2021 12/31/2023 N/A N No
AG1-327 - Ringgold – East Waynesboro 138 kV PA Franklin Active APS 35 35 23.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1327_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2023 N/A N No
AG1-330 + Beavertown 12.47 kV ASD Brick Plant PA2 Solar PA Beaver Engineering and Procurement PPL 5 5 4.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1330_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1330_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1330_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1330_wmpa.pdf Not Required N/A N/A 9/30/2020 N/A N/A 3/1/2024 3/1/2024 N/A N No
AG1-330 - Beavertown 12.47 kV ASD Brick Plant PA2 Solar PA Beaver Engineering and Procurement PPL 5 5 4.5 Capacity Generation Interconnection Solar; Battery https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1330_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1330_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1330_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1330_wmpa.pdf Not Required N/A N/A 9/30/2020 N/A N/A 3/1/2024 3/1/2024 N/A N No
AG1-331 + Conneaut-Conneaut Tap 69 kV PA Crawford Withdrawn ATSI 5 5 4.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1331_fea.pdf Document Posted Withdrawn N/A N/A 9/30/2020 N/A N/A 8/27/2021 7/31/2022 N/A N No
AG1-331 - Conneaut-Conneaut Tap 69 kV PA Crawford Active ATSI 5 5 4.4 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1331_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 7/31/2022 N/A N No
AG1-338 + Curryville-RKB-Yellow Creek 23 kV I PA Bedford Withdrawn PENELEC 5 5 4.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1338_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1338_imp.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 9/9/2021 6/30/2023 N/A N No
AG1-338 - Curryville-RKB-Yellow Creek 23 kV I PA Bedford Active PENELEC 5 5 4.4 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1338_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/30/2023 N/A N No
AG1-340 + Curryville 23 kV PA Bedford Withdrawn PENELEC 5 5 3.2 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1340_fea.pdf Document Posted Withdrawn N/A N/A 9/30/2020 N/A N/A 8/27/2021 6/30/2024 N/A N No
AG1-340 - Curryville 23 kV PA Bedford Active PENELEC 5 5 3.2 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1340_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/30/2024 N/A N No
AG1-345 + Crewe 12.5 kV VA Nottoway Withdrawn Dominion 8 8 4.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1345_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1345_imp.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 10/8/2021 6/1/2022 N/A N No
AG1-345 - Crewe 12.5 kV VA Nottoway Active Dominion 8 8 4.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1345_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2022 N/A N No
AG1-348 + Pequest River-Washington 34.5 kV NJ Warren Active JCPL 19.8 19.8 8.316 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1348_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1348_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/17/2021 N/A N No
AG1-348 - Pequest River-Washington 34.5 kV NJ Warren Active JCPL 19.8 19.8 8.316 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1348_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/17/2021 N/A N No
AG1-349 + Olive-Reynolds #2 345 kV IN Pulaski Active AEP 260 260 156 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1349_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1349_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/30/2023 N/A N No
AG1-349 - Olive-Reynolds #2 345 kV IN Pulaski Active AEP 260 260 156 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1349_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/30/2023 N/A N No
AG1-351 + Harrison-Good Hope 138 kV OH Fairfield Active AEP 142 58 34.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1351_fea.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 12/31/2023 N/A N No
AG1-351 - Harrison-Good Hope 138 kV OH Fairfield Active AEP 142 58 34.8 Capacity Generation Interconnection Solar In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2023 N/A N No
AG1-352 + Hunt Farm Junction 69 kV KY Boyle Withdrawn EKPC 50 50 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1352_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1352_imp.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 9/28/2021 12/31/2023 N/A N No
AG1-352 - Hunt Farm Junction 69 kV KY Boyle Active EKPC 50 50 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1352_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2023 N/A N No
AG1-358 + Howard-Melmore 138 kV OH Crawford Active AEP 58 58 34.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1358_fea.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 12/31/2023 N/A N No
AG1-358 - Howard-Melmore 138 kV OH Crawford Active AEP 58 58 34.8 Capacity Generation Interconnection Solar In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2023 N/A N No
AG1-363 + Black Oak-Hatfield 500 kV MD Garrett Active APS 300 300 220 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1363_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1363_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2024 N/A N No
AG1-363 - Black Oak-Hatfield 500 kV MD Garrett Active APS 300 300 220 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1363_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2024 N/A N No
AG1-365 + Allen 345 kV IN Allen Active AEP 200 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1365_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1365_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/31/2024 N/A N No
AG1-365 - Allen 345 kV IN Allen Active AEP 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1365_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/31/2024 N/A N No
AG1-366 + Allen 345 kV IN Allen Active AEP 250 50 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1366_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1366_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/31/2024 N/A N No
AG1-366 - Allen 345 kV IN Allen Active AEP 50 50 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1366_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/31/2024 N/A N No
AG1-368 + Tillman 138 kV IN Allen Active AEP 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1368_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1368_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/31/2024 N/A N No
AG1-368 - Tillman 138 kV IN Allen Active AEP 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1368_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/31/2024 N/A N No
AG1-369 + Logtown 138 kV OH Paulding Active AEP 49.9 49.9 29.94 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1369_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1369_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/31/2023 N/A N No
AG1-369 - Logtown 138 kV OH Paulding Active AEP 49.9 49.9 29.94 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1369_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/31/2023 N/A N No
AG1-373 + Nelson-Electric Junction 345 kV IL Lee Active ComEd 100 0 10 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1373_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1373_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 11/1/2024 N/A N No
AG1-373 - Nelson-Electric Junction 345 kV IL Lee Active ComEd 100 0 10 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1373_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 11/1/2024 N/A N No
AG1-377 + Philipsburg 115 kV PA Centre Active PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1377_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1377_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 8/15/2023 N/A N No
AG1-377 - Philipsburg 115 kV PA Centre Active PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1377_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 8/15/2023 N/A N No
AG1-378 + Philipsburg 115 kV PA Centre Active PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1378_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1378_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 8/15/2023 N/A N No
AG1-378 - Philipsburg 115 kV PA Centre Active PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1378_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 8/15/2023 N/A N No
AG1-382 + SGC Tap-Reese REC 46 kV PA Cambria Active PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1382_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1382_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 3/1/2022 N/A N No
AG1-382 - SGC Tap-Reese REC 46 kV PA Cambria Active PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1382_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 3/1/2022 N/A N No
AG1-383 + Hickory 34.5 kV VA City of Chesapeake Active Dominion 20 20 15.43 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1383_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1383_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 3/1/2022 N/A N No
AG1-383 - Hickory 34.5 kV VA City of Chesapeake Active Dominion 20 20 15.43 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1383_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1383_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 3/1/2022 N/A N No
AG1-388 + Dunnsville 34.5 kV Ex-Umphlette LLC VA Essex Engineering and Procurement Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1388_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1388_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1388_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1388_wmpa.pdf Not Required N/A N/A 9/30/2020 N/A N/A 3/31/2023 3/31/2023 N/A N No
AG1-388 - Dunnsville 34.5 kV VA Essex Active Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1388_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2022 N/A N No
AG1-392 + Gold 115 kV I PA Potter Active PENELEC 40 40 24 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1392_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2022 N/A N No
AG1-392 - Gold 115 kV I PA Potter Active PENELEC 40 40 24 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1392_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2022 N/A N No
AG1-393 + Fort Pickett DP 34.5 kV VA Dinwiddie Active Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1393_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1393_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 3/1/2022 N/A N No
AG1-393 - Fort Pickett DP 34.5 kV VA Dinwiddie Active Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1393_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 3/1/2022 N/A N No
AG1-394 + Boykins 34.5 kV VA Southampton Active Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1394_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1394_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 3/1/2022 N/A N No
AG1-394 - Boykins 34.5 kV VA Southampton Active Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1394_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 3/1/2022 N/A N No
AG1-398 + Brokaw-Lanesville 345 kV IL Fulton Active ComEd 200 0 7.33 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1398_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1398_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 9/30/2021 N/A N No
AG1-398 - Brokaw-Lanesville 345 kV IL Fulton Active ComEd 200 0 7.33 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1398_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 9/30/2021 N/A N No
AG1-403 + Blue Mound-Chestnut 345 kV IL McLean Active ComEd 200 200 35.2 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1403_fea.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 9/24/2024 N/A N No
AG1-403 - Clinton-Brokaw 345 kV IL McLean Active ComEd 200 200 35.2 Capacity Generation Interconnection Wind In Progress N/A N/A 9/30/2020 N/A N/A 9/24/2024 N/A N No
AG1-404 + Blue Mound-Chestnut 345 kV IL McLean Active ComEd 100 100 100 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1404_fea.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 9/24/2024 N/A N No
AG1-404 - Clinton-Brokaw 345 kV IL McLean Active ComEd 100 100 100 Capacity Generation Interconnection Storage In Progress N/A N/A 9/30/2020 N/A N/A 9/24/2024 N/A N No
AG1-405 + Walnut Grove-Asahi 69 kV KY McLean Active EKPC 57 57 34.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1405_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1405_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 9/25/2024 N/A N No
AG1-405 - Walnut Grove-Asahi 69 kV KY McLean Active EKPC 57 57 34.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1405_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 9/25/2024 N/A N No
AG1-406 + Walnut Grove-Asahi 69 kV KY McLean Active EKPC 79 22 22 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1406_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1406_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 9/25/2024 N/A N No
AG1-406 - Walnut Grove-Asahi 69 kV KY McLean Active EKPC 79 22 22 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1406_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 9/25/2024 N/A N No
AG1-410 + Maddox Creek-RP Mone 345 kV OH Van Wert Active AEP 300 300 180 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1410_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1410_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 9/25/2024 N/A N No
AG1-410 - Maddox Creek-RP Mone 345 kV OH Van Wert Active AEP 300 300 180 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1410_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 9/25/2024 N/A N No
AG1-412 + Ladysmith CT-Mine Road 230 kV VA Caroline Active Dominion 200 200 80 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1412_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1412_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/1/2023 N/A N No
AG1-412 - Ladysmith CT-Mine Road 230 kV VA Caroline Active Dominion 200 200 80 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1412_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/1/2023 N/A N No
AG1-415 + Double Toll Date-Old Chapel 138 kV VA Clarke Active APS 50 50 25 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1415_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1415_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 1/2/2023 N/A N No
AG1-415 - Double Toll Date-Old Chapel 138 kV VA Clarke Active APS 50 50 25 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1415_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 1/2/2023 N/A N No
AG1-416 + Sleepy Hollow 138 kV WV Jefferson Active APS 125 125 91 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1416_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1416_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/30/2023 N/A N No
AG1-416 - Sleepy Hollow 138 kV WV Jefferson Active APS 125 125 91 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1416_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/30/2023 N/A N No
AG1-417 + Gateway 69 kV IN Whitley Active AEP 50 50 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1417_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1417_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/29/2023 N/A N No
AG1-417 - Gateway 69 kV IN Whitley Active AEP 50 50 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1417_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/29/2023 N/A N No
AG1-418 + Gateway 69 kV IN Whitley Active AEP 50 50 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1418_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1418_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/29/2023 N/A N No
AG1-418 - Gateway 69 kV IN Whitley Active AEP 50 50 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1418_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/29/2023 N/A N No
AG1-419 + Lynnville-South Hamburg 69 kV PA Berks Active ME 50 50 21 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1419_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1419_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/29/2023 N/A N No
AG1-419 - Lynnville-South Hamburg 69 kV PA Berks Active ME 50 50 21 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1419_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/29/2023 N/A N No
AG1-420 + Campbell-Kiesters 138 kV PA Butler Active APS 70 70 42 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1420_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1420_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/29/2023 N/A N No
AG1-420 - Campbell-Kiesters 138 kV PA Butler Active APS 70 70 42 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1420_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/29/2023 N/A N No
AG1-421 + Lexington-Dooms 230 kV VA Augusta Active Dominion 200 200 120 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1421_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1421_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/29/2023 N/A N No
AG1-421 - Lexington-Dooms 230 kV VA Augusta Active Dominion 200 200 120 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1421_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/29/2023 N/A N No
AG1-422 + Lexington-Dooms 230 kV VA Augusta Active Dominion 50 50 50 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1422_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1422_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/29/2023 N/A N No
AG1-422 - Lexington-Dooms 230 kV VA Augusta Active Dominion 50 50 50 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1422_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/29/2023 N/A N No
AG1-424 + Sowers 138 kV IN Allen Active AEP 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1424_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1424_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/29/2023 N/A N No
AG1-424 - Sowers 138 kV IN Allen Active AEP 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1424_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/29/2023 N/A N No
AG1-436 + Olive-University Park 345 kV IN LaPorte Active AEP 250 125 75 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1436_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1436_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2023 N/A N No
AG1-436 - Olive-University Park 345 kV IN LaPorte Active AEP 250 125 75 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1436_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2023 N/A N No
AG1-447 + Olive-University Park 345 kV IN LaPorte Active AEP 305 55 55 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1447_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1447_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2023 N/A N No
AG1-447 - Olive-University Park 345 kV IN LaPorte Active AEP 305 55 55 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1447_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2023 N/A N No
AG1-448 + Olive-University Park 345 kV IN LaPorte Active AEP 360 55 55 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1448_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1448_imp.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 12/31/2023 N/A N No
AG1-448 - Olive-University Park 345 kV IN LaPorte Active AEP 360 55 55 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1448_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2023 N/A N No
AG1-450 + Airey-Vienna 69 kV II MD Dorchester Active DPL 125 25 25 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1450_fea.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 12/31/2022 N/A N No
AG1-450 - Airey-Vienna 69 kV II MD Dorchester Active DPL 125 25 25 Capacity Generation Interconnection Storage In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2022 N/A N No
AG1-453 + Guardian 138 kV IN Noble Active AEP 140 140 84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1453_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1453_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2023 N/A N No
AG1-453 - Guardian 138 kV IN Noble Active AEP 140 140 84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1453_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2023 N/A N No
AG1-454 + Guardian 138 kV IN Noble Active AEP 50 50 50 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1454_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1454_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2022 N/A N No
AG1-454 - Guardian 138 kV IN Noble Active AEP 50 50 50 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1454_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2022 N/A N No
AG1-456 + Wildcat 138 kV OH Highland Active AEP 180 30 30 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1456_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1456_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2022 N/A N No
AG1-456 - Wildcat 138 kV OH Highland Active AEP 180 30 30 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1456_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2022 N/A N No
AG1-460 + Kincaid-Pana 345 kV IL Christian Active ComEd 30 30 12 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1460_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1460_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2022 N/A N No
AG1-460 - Kincaid-Pana 345 kV IL Christian Active ComEd 30 30 12 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1460_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2022 N/A N No
AG1-461 + Mumford 69 kV DE Sussex Withdrawn DPL 30 30 19.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1461_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1461_imp.pdf Document Posted Withdrawn N/A N/A 9/30/2020 N/A N/A 9/20/2021 12/31/2023 N/A N No
AG1-461 - Mumford 69 kV DE Sussex Active DPL 30 30 19.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1461_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2023 N/A N No
AG1-462 + Cordova B 345 kV IL Whiteside Active ComEd 255 255 153 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1462_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/1/2023 N/A N No
AG1-462 - Cordova B 345 kV IL Whiteside Active ComEd 255 255 153 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1462_fea.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 10/1/2023 N/A N No
AG1-464 + Harrington 69 kV DE Kent Active DPL 50 50 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1464_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1464_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 9/17/2023 N/A N No
AG1-464 - Harrington 69 kV DE Kent Active DPL 50 50 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1464_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 9/17/2023 N/A N No
AG1-465 + North Hanover-Gitts Run 115 kV PA York Active ME 100 100 40 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1465_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1465_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 3/5/2025 N/A N No
AG1-465 - North Hanover-Gitts Run 115 kV PA York Active ME 100 100 40 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1465_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 3/5/2025 N/A N No
AG1-466 + Orange 34.5 kV VA Orange Active Dominion 14 14 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1466_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1466_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/19/2022 N/A N No
AG1-466 - Orange 34.5 kV VA Orange Active Dominion 14 14 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1466_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/19/2022 N/A N No
AG1-467 + Somerset 34.5 kV VA Orange Active Dominion 15.6 15.6 9.36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1467_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1467_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/28/2022 N/A N No
AG1-467 - Somerset 34.5 kV VA Orange Active Dominion 15.6 15.6 9.36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1467_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/28/2022 N/A N No
AG1-469 + Gordonsville 34.5 kV VA Louisa Active Dominion 15.6 15.6 9.36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1469_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1469_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 11/11/2022 N/A N No
AG1-469 - Gordonsville 34.5 kV VA Louisa Active Dominion 15.6 15.6 9.36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1469_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 11/11/2022 N/A N No
AG1-471 + Up Church-Wayne County 69 kV KY Wayne Active EKPC 60 60 36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1471_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1471_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/2/2023 N/A N No
AG1-471 - Up Church-Wayne County 69 kV KY Wayne Active EKPC 60 60 36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1471_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/2/2023 N/A N No
AG1-476 + Mickelton 230 kV II NJ Gloucester Active AEC 869 0 33.1 Capacity Generation Interconnection Natural Gas; Other https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1476_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1476_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2023 N/A N No
AG1-476 - Mickelton 230 kV II NJ Gloucester Active AEC 869 0 33.1 Capacity Generation Interconnection Natural Gas; Other https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1476_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2023 N/A N No
AG1-478 + Wilmington 34.5 kV IL Will Active ComEd 19.9 19.9 15.9 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1478_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1478_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/29/2023 N/A N No
AG1-478 - Will County 34.5 kV IL Will Active ComEd 19.9 19.9 15.9 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1478_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/29/2023 N/A N No
AG1-481 + Warren 34.5 kV PA Warren Withdrawn PENELEC 15.5 15.53 15.53 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1481_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1481_imp.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 11/1/2021 6/1/2024 N/A N No
AG1-481 - Warren 34.5 kV PA Warren Active PENELEC 15.5 15.53 15.53 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1481_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-483 + Dickerson 230 kV MD Montgomery Active PEPCO 542.5 542.5 542.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1483_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1483_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-483 - Dickerson 230 kV MD Montgomery Active PEPCO 542.5 542.5 542.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1483_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-484 + Mountain 115 kV PA Cumberland Withdrawn ME 20 20 20 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1484_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1484_imp.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 11/1/2021 6/1/2024 N/A N No
AG1-484 - Mountain 115 kV PA Cumberland Active ME 20 20 20 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1484_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-485 + Brunot Island 138 kV PA Allegheny Active DL 55 55 55 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1485_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1485_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-485 - Brunot Island 138 kV PA Allegheny Active DL 55 55 55 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1485_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-486 + Orrtanna 115 kV PA Adams Active ME 15 15 15 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1486_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1486_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-486 - Orrtanna 115 kV PA Adams Active ME 15 15 15 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1486_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-487 + Gilbert 230 kV NJ Hunterdon Active JCPL 20 20 20 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1487_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1487_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-487 - Gilbert 230 kV NJ Hunterdon Active JCPL 20 20 20 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1487_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-489 + McClelland-Hoytdale 345 kV PA Lawrence Active ATSI 175 175 145 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1489_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1489_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2023 N/A N No
AG1-489 - McClelland-Hoytdale 345 kV PA Lawrence Active ATSI 175 175 145 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1489_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2023 N/A N No
AG1-490 + Shenango-McDowell 138 kV PA Mercer Withdrawn ATSI 125 125 105 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1490_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1490_imp.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 9/16/2021 6/1/2023 N/A N No
AG1-490 - Shenango-McDowell 138 kV PA Mercer Active ATSI 125 125 105 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1490_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2023 N/A N No
AG1-492 + Kargle to Elizabethtown 69 kV KY Unknown Active EKPC Energy Merchant Transmission Not Required https://www.pjm.com/pub/planning/project-queues/arr-impact-studies/ag1492_arr-imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/20/2020 N/A EE No
AG1-492 - Kargle to Elizabethtown 69 kV KY Unknown Active EKPC Energy Merchant Transmission Not Required In Progress N/A N/A 9/30/2020 N/A N/A 10/20/2020 N/A EE No
AG1-493 + Blue Jacket to Blue Jacket Tap 69 kV OH Logan Active Dayton Energy Merchant Transmission Not Required https://www.pjm.com/pub/planning/project-queues/arr-impact-studies/ag1493_arr-imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/20/2020 N/A EE No
AG1-493 - Blue Jacket to Blue Jacket Tap 69 kV OH Logan Active Dayton Energy Merchant Transmission Not Required In Progress N/A N/A 9/30/2020 N/A N/A 10/20/2020 N/A EE No
AG1-495 + Gilbert-Rocktown 34.5 kV NJ Hunterdon Active JCPL 19.8 19.8 8.316 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1495_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1495_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/17/2021 N/A N No
AG1-495 - Gilbert-Rocktown 34.5 kV NJ Hunterdon Active JCPL 19.8 19.8 8.316 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1495_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/17/2021 N/A N No
AG1-497 + Cartanza 230 kV DE Kent Active DPL 120 120 84 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1497_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1497_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/30/2023 N/A N No
AG1-497 - Cartanza 230 kV DE Kent Active DPL 120 120 84 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1497_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/30/2023 N/A N No
AG1-499 + Lambs 12.47 kV NJ Gloucester Active AEC 10 10 6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1499_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1499_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 9/30/2020 N/A N No
AG1-499 - Henry Harris 69 kV NJ Gloucester Active AEC 12.6 12.6 7.56 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1499_fea.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 9/30/2020 N/A N No
AG1-501 + Beaver 138 kV OH Lorain Active ATSI 106.5 11.3 10 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1501_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1501_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/1/2022 N/A N No
AG1-501 - Beaver 138 kV OH Lorain Active ATSI 106.5 11.3 10 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1501_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/1/2022 N/A N No
AG1-502 + Oak Green 115 kV VA Orange Active Dominion 80 80 64 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1502_fea.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 6/30/2023 N/A N No
AG1-502 - Oak Green 115 kV VA Orange Active Dominion 80 80 64 Capacity Generation Interconnection Solar In Progress N/A N/A 9/30/2020 N/A N/A 6/30/2023 N/A N No
AG1-503 + Oak Green 115 kV VA Orange Active Dominion 20 20 16 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1503_fea.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 6/30/2023 N/A N No
AG1-503 - Oak Green 115 kV VA Orange Active Dominion 20 20 16 Capacity Generation Interconnection Solar In Progress N/A N/A 9/30/2020 N/A N/A 6/30/2023 N/A N No
AG1-504 + Glenbrook-Salem 69 kV PA Luzerne Withdrawn PPL 68 68 41.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1504_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1504_imp.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 10/5/2021 12/31/2023 N/A N No
AG1-504 - Glenbrook-Salem 69 kV PA Luzerne Active PPL 68 68 41.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1504_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2023 N/A N No
AG1-507 + Calumet 138 kV IL Cook Active ComEd 296 296 296 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1507_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1507_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2023 N/A N No
AG1-507 - Calumet 138 kV IL Cook Active ComEd 296 0 0 Energy Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1507_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2023 N/A N No
AG1-508 + Independence 69 kV VA Grayson Active AEP 63.3 63.3 9.3 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1508_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1508_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 3/1/2025 N/A N No
AG1-508 - Independence 69 kV VA Grayson Active AEP 63.3 63.3 9.3 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1508_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 3/1/2025 N/A N No
AG1-509 + Independence 69 kV VA Grayson Active AEP 105.4 105.4 15.5 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1509_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1509_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 3/1/2025 N/A N No
AG1-509 - Independence 69 kV VA Grayson Active AEP 105.4 105.4 15.5 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1509_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 3/1/2025 N/A N No
AG1-510 + Kittatinny-Blairstown 34.5 kV NJ Warren Active JCPL 20 20 12 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1510_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1510_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-510 - Kittatinny-Blairstown 34.5 kV NJ Warren Active JCPL 20 20 12 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1510_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-511 + Kittatinny 230 kV NJ Warren Active JCPL 50 50 30 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1511_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1511_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-511 - Kittatinny 230 kV NJ Warren Active JCPL 50 50 30 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1511_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-512 + University Park North 345 kV IL Will Active ComEd 646 40 16 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1512_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1512_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-512 - University Park North 345 kV IL Will Active ComEd 646 40 16 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1512_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-513 + Aurora 138 kV IL Will Active ComEd 1026 10 4 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1513_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1513_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-513 - Aurora 138 kV IL Will Active ComEd 1026 10 4 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1513_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-514 + Springdale CT III 138 kV PA Allegheny Active APS 106 10 4 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1514_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1514_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-514 - Springdale CT III 138 kV PA Allegheny Active APS 106 10 4 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1514_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-517 + Osage 138 kV WV Monongalia Active APS 50 0 0 Energy Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1517_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1517_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 4/1/2022 N/A N No
AG1-517 - Osage 138 kV WV Monongalia Active APS 50 0 0 Energy Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1517_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 4/1/2022 N/A N No
AG1-518 + Suffolk 230 kV VA City of Suffolk Active Dominion 50 50 50 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1518_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1518_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 9/1/2023 N/A N No
AG1-518 - Suffolk 230 kV VA City of Suffolk Active Dominion 50 50 50 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1518_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 9/1/2023 N/A N No
AG1-519 + Cash’s Corner 230 kV VA Louisa Withdrawn Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1519_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1519_imp.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 9/16/2021 10/28/2022 N/A N No
AG1-519 - Cash’s Corner 230 kV VA Louisa Active Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1519_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/28/2022 N/A N No
AG1-520 + Hooversville-Rockingham 23 kV PA Somerset Active PENELEC 4 4 0 Energy Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1520_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1520_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 1/1/2022 N/A Y No
AG1-520 - Hooversville-Rockingham 23 kV PA Somerset Active PENELEC 4 4 0 Energy Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1520_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 1/1/2022 N/A Y No
AG1-527 + Imperial-Joffre 138 kV PA Allegheny Active APS 215 215 129 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1527_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1527_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2023 N/A N No
AG1-527 - Imperial-Joffre 138 kV PA Allegheny Active APS 215 215 129 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1527_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2023 N/A N No
AG1-528 + Tenmile 138 kV WV N/A Active AEP 225 225 135 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1528_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1528_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2023 N/A N No
AG1-528 - Tenmile 138 kV WV N/A Active AEP 225 225 135 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1528_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2023 N/A N No
AG1-529 + Farmview 138 kV DE Sussex Active DPL 75 75 48.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1529_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1_529_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2023 N/A N No
AG1-529 - Farmview 138 kV DE Sussex Active DPL 75 75 48.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1529_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2023 N/A N No
AG1-532 + Fields 34.5 kV VA Greensville Active Dominion 13.5 13.5 8.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1532_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1532_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/12/2022 N/A N No
AG1-532 - Fields 34.5 kV VA Greensville Active Dominion 13.5 13.5 8.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1532_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/12/2022 N/A N No
AG1-533 + Bartonsville-Meadowbrook 138 kV IV VA Frederick Active APS 170 40 24 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1533_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1533_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/12/2023 N/A N No
AG1-533 - Bartonsville-Meadowbrook 138 kV IV VA Frederick Active APS 170 40 24 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1533_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/12/2023 N/A N No
AG1-534 + Evergreen Mills 230 kV VA Loudoun Active Dominion 200 200 200 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1534_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1534_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2023 N/A N No
AG1-534 - Evergreen Mills 230 kV VA Loudoun Active Dominion 200 200 200 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1534_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2023 N/A N No
AG1-535 + State Line-S. Chicago Properties 138 kV IL Cook Active ComEd 85 85 85 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1535_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1535_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2023 N/A N No
AG1-535 - State Line-S. Chicago Properties 138 kV IL Cook Active ComEd 85 85 85 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1535_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2023 N/A N No
AG1-537 + Barterbrook-Stuarts Draft 115 kV VA Augusta Active Dominion 75 75 32 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1537_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1537_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/1/2024 N/A N No
AG1-537 - Barterbrook-Stuarts Draft 115 kV VA Augusta Active Dominion 75 75 32 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1537_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/1/2024 N/A N No
AG1-538 + Remington-Gordonsville 230 kV VA Culpeper Active Dominion 75 75 32 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1538_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1538_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/1/2024 N/A N No
AG1-538 - Remington-Gordonsville 230 kV VA Culpeper Active Dominion 75 75 32 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1538_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/1/2024 N/A N No
AG1-541 + St. Johns 115 kV VA Hanover Active Dominion 75 75 32 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1541_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1541_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/1/2024 N/A N No
AG1-541 - St. Johns 115 kV VA Hanover Active Dominion 75 75 32 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1541_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/1/2024 N/A N No
AG1-545 + W. Quaker Rd-Disputanta 34.5 kV VA Prince George Withdrawn Dominion 20 20 14 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1545_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1545_imp.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 9/17/2021 10/1/2024 N/A N No
AG1-545 - W. Quaker Rd-Disputanta 34.5 kV VA Prince George Active Dominion 20 20 14 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1545_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/1/2024 N/A N No
AG1-551 + Parmele 12.5 kV NC Martin Active Dominion 20 20 13.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1551_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1551_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/15/2023 N/A N No
AG1-551 - Parmele 12.5 kV NC Martin Active Dominion 20 20 14 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1551_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/15/2023 N/A N No
AG1-554 + South Kenton 138 kV OH Hardin Active AEP 50 49.99 32.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1554_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1554_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/31/2023 N/A N No
AG1-554 - South Kenton 138 kV OH Hardin Active AEP 50 49.99 32.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1554_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/31/2023 N/A N No
AG1-555 + Dequine 345 kV IN Tippecance Active AEP 120 120 88.4 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1555_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1555_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-555 - Dequine 345 kV IN Tippecance Active AEP 120 120 88.4 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1555_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-559 + Caroline Pines 22 kV VA Hanover Active Dominion 20 20 13.3 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1559_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/21/2022 N/A N No
AG1-559 - Caroline Pines 22 kV VA Hanover Active Dominion 20 20 13.3 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1559_fea.pdf Document Posted Not Required N/A N/A 9/30/2020 N/A N/A 10/21/2022 N/A N No
AG1-562 + Marysville-Gunn Road 345 kV OH Hardin Active AEP 250 250 150 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1562_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1562_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/4/2023 N/A N No
AG1-562 - Marysville-Gunn Road 345 kV OH Hardin Active AEP 250 250 150 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1562_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/4/2023 N/A N No
AG2-012 + Lardin 12 kV PA Fayette Active APS 0.2 0.165 0 Energy Generation Interconnection Solar Not Required Not Required N/A N/A 10/14/2020 N/A N/A 11/30/2020 N/A Y No
AG2-012 - Lardin 12 kV PA Fayette Active APS 0.2 0.165 0 Energy Generation Interconnection Solar In Progress N/A N/A 10/14/2020 N/A N/A 11/30/2020 N/A Y No
AG2-050 + Randle Cliff 13.8 kV MD Calvert Active BGE 1 1 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag2050_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag2050_imp.pdf Document Posted Not Required N/A N/A 11/25/2020 N/A N/A 9/13/2021 N/A Y No
AG2-050 - Randle Cliff 13.8 kV MD Calvert Active BGE 1 1 0 Energy Generation Interconnection Storage In Progress N/A N/A 11/25/2020 N/A N/A 9/13/2021 N/A Y No
AG2-052 5090276 + NIPS-PJM N/A N/A Confirmed Northern Indiana Public Service Company 2 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/ag2052_fea.pdf Executed Agreement and/or Study N/A N/A 12/3/2020 2/1/2021 2/1/2026 N/A PP No
AG2-052 5090276 - NIPS-PJM N/A N/A Active Northern Indiana Public Service Company 2 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/ag052_fea.pdf Executed Agreement and/or Study N/A N/A 12/3/2020 2/1/2021 2/1/2026 N/A PP No
AG2-109 + Fitchville-New London 69 kV OH Huron Active ATSI 40 40 28.1 Capacity Generation Interconnection Solar In Progress N/A N/A 1/29/2021 N/A N/A 12/31/2023 N/A N No
AG2-109 - Hanville-Wellington 69 kV OH Huron Active ATSI 40 40 28.1 Capacity Generation Interconnection Solar In Progress N/A N/A 1/29/2021 N/A N/A 12/31/2023 N/A N No
AG2-135 + Hoffman Estates 12.5 kV OH Pickaway Active Unknown 0.3 0.28 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag2135_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag2135_imp.pdf Document Posted Not Required N/A N/A 2/4/2021 N/A N/A 7/30/2021 N/A Y No
AG2-135 - Hoffman Estates 12.5 kV OH Pickaway Active ComEd 0.3 0.28 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag2135_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag2135_imp.pdf Document Posted Not Required N/A N/A 2/4/2021 N/A N/A 7/30/2021 N/A Y No
AG2-138 + Olive-University Park 345 kV IN LaPorte Active AEP Energy Merchant Transmission Not Required In Progress N/A N/A 2/9/2021 N/A N/A 2/8/2021 N/A EE No
AG2-138 - Olive-University Park 345 kV IN LaPorte Active AEP Energy Merchant Transmission Not Required N/A N/A 2/9/2021 N/A N/A 2/8/2021 N/A EE No
AG2-205 + Bonney Forge 23 kV N/A N/A Active PENELEC Energy Generation Interconnection Not Required Not Required N/A N/A 3/5/2021 N/A N/A 5/1/2023 N/A Y No
AG2-205 - Bonney Forge 23 kV N/A N/A Active PENELEC Energy Generation Interconnection In Progress N/A N/A 3/5/2021 N/A N/A 5/1/2023 N/A Y No